background image

4.4 Check mounting

When all mounting kits have been installed, check them for proper mounting.
In particular, force shunts should be avoided.
It is essential to check:

-

that the load cell has been inserted in the mounting kit without being canted.

-

whether the upper and lower plates are mounted in a horizontal position.

-

whether free moving space and the required play for thermal expansion are provided.

The free moving space which is required for displacement of the measured object due to

thermal expansion, vibration, etc. can be utilized without reducing the measuring

accuracy only if the load cell has been installed exactly.
To avoid force shunts, all incoming and outgoing lines (hoses, pipes, cables) must be

connected to the measured object with the greatest lexibility possible.
The entire load must be supported by the load cells!

6. Connect an equipotential bonding conductor (not supplied with the mounting kit)

between the vessel frame and the foundation.

7. Carefully place the vessel on the installed mounting kit and screw to the elastomer

supports.

Mounting kit with elastomer support PR 92/00N

4 Installation

EN-10

Minebea Intec

Содержание PR 92/00N

Страница 1: ...upport PR 92 00N Installation manual Translation of the original installation manual 9499 053 92000 Edition 7 1 0 10 17 2019 Minebea Intec GmbH Meiendorfer Str 205 A 22145 Hamburg Germany Phone 49 40...

Страница 2: ...iied personnel In correspondence concerning this product the type name and release number serial number as well as all license numbers relating to the product have to be cited Note This document is pa...

Страница 3: ...4 2 3 Initial inspection 4 2 4 Before operational startup 4 3 Speciications 5 3 1 Equipment supplied 5 3 1 1 Mounting kit PR 92 00N 5 3 2 Dimensions 6 3 3 Technical data 7 4 Installation 8 4 1 Prior...

Страница 4: ...measures for preventing hazards are not followed DANGER Warning of personal injury DANGER indicates death or severe irreversible personal injury which will occur if the corresponding safety measures a...

Страница 5: ...ironment may occur if appropriate safety measures are not observed Take the corresponding safety precautions Note User tips useful information and notes 1 6 Hotline Phone 49 40 67960 444 Fax 49 40 679...

Страница 6: ...over or being shifted thus eliminating danger to people animals or goods even in the case of a break in a load cell or mounting element Installation and repair work must only be carried out by expert...

Страница 7: ...plied 3 1 1 Mounting kit PR 92 00N No Description 1 Elastomer support 2 Lower plate 3 Mounting bolt 2 4 Washer 2 5 Spacer plate 6 Quick guide not shown 3 Speciications Mounting kit with elastomer supp...

Страница 8: ...sions PR 92 00N All dimensions in mm Ensure the spacer plate is in the correct position Load cell MP 58 126 4 mm MP 79 127 3 mm Mounting kit with elastomer support PR 92 00N 3 Speciications EN 6 Mineb...

Страница 9: ...22 kN Permissible horizontal displacement 2 5 mm at 1 kN Permissible temperature range 20 C 65 C Material Elastomer support Lower plate Spacer plate Natural rubber Steel galvanized chromated and seale...

Страница 10: ...ampening or for temperature insulation a load compensating plate must be provided between this soft iller layer and the mounting kit to ensure even load application into the mounting kit The design of...

Страница 11: ...ps must be carried out on all support points of the weighing object Procedure 1 At the supporting point elastomer support vessel frame make the borehole for the elastomer support 1 in the vessel frame...

Страница 12: ...asured object due to thermal expansion vibration etc can be utilized without reducing the measuring accuracy only if the load cell has been installed exactly To avoid force shunts all incoming and out...

Страница 13: ...bottom and around the mounting kit NOTICE Some cleaning agents may not be compatible with the mounting kit material When using cleaning agents ensure that their compatibility with the mounting kit mat...

Страница 14: ...municipal waste so that it can then be recycled Before disposing of or scrapping the product any batteries should be removed and taken to a suitable collection point Please see our T Cs for further i...

Страница 15: ......

Страница 16: ...Published by Minebea Intec GmbH Meiendorfer Strasse 205 A 22145 Hamburg Germany Phone 49 40 67960 303 Email info minebea intec com www minebea intec com...

Отзывы: