Load cells to be used
Load cells not to be used
MP 55/..C3MR+
MP 55/..C3MR+E
PR 40/..C3MR
PR 43/..C3MR
PR 47/..C3MR
PR 76/..N, /..C3
MP 77/..C3MR
MP 77/..C3MR E
MP 79(T)/..C3MR
MP 79(T)/..C3MR E
2.3 Initial inspection
Check the contents of the consignment for completeness. Check the contents visually to
determine whether any damage has occurred during transport. If there are grounds for
rejection of the goods, a claim must be iled with the carrier immediately. The
Minebea Intec sales or service organization must also be notiied.
2.4 Before operational startup
NOTICE
Perform visual inspection.
Before operational startup as well as after storage or transport, inspect the device
visually for signs of mechanical damage.
2.5 Repairs and maintenance
2.5.1
General information
Repairs are subject to inspection and must be carried out at Minebea Intec.
In case of defect or malfunction, please contact your local Minebea Intec dealer or service
center for repair.
When returning the device for repair, please include a precise and complete description of
the problem.
Maintenance work may only be carried out by a trained technician with expert knowledge
of the hazards involved and the required precautions.
Cable Junction Box MP 90/04
2 Safety instructions
EN-6
Minebea Intec
Содержание MP 90/04
Страница 4: ...6 4 Cleaning 19 7 Disposal 20 Cable Junction Box MP 90 04 Table of contents EN 2 Minebea Intec ...
Страница 11: ...3 4 Dimensions all dimensions in mm 3 Speciications Cable Junction Box MP 90 04 Minebea Intec EN 9 ...
Страница 17: ...Connection example 5 Cable connections Cable Junction Box MP 90 04 Minebea Intec EN 15 ...
Страница 23: ......