Mincey Marble Manufacturing FR-03 Скачать руководство пользователя страница 5

 

6.  Using a # 2 Phillips head screwdriver, tighten the truss head screws as tightly as 

possible. You will hear creaking noises when the screw is tight against the support of the 
foot rest ledge. 

A right-angle screwdriver will make it easier to turn the screws. A 

ratcheting right-angle screw driver is optimal for this installation

.

 

 

7.  Once the truss head screws have been tightened, try to move the foot rest ledge by 

applying pressure with your hands to the foot rest ledge. If there is any movement, re-
tighten the screws until movement stops.

 

 

8.  Apply color matching silicone around the perimeter of the foot rest ledge to seal the foot 

rest ledge to the cast marble panels. This seal should go around the entire perimeter of 
the foot rest ledge, even under the bottom of the foot rest ledge. 

 

 

DISCLAIMER NOTICE: If the prescribed method of installation is not followed 
precisely, the foot rest ledge may detach from the wall and cause damage to the 
panels and the walls. If the foot rest ledge detaches, physical injury to the 
occupant of the shower may occur. Mincey Marble will not be liable for any 
damages to persons or property because of incorrect installation.  

 

For complete information on installing the foot rest ledge into an area which 

DOES NOT

 

have wood blocking, please see Section II. 

 

The completed installation of the panel system shower pan and foot rest ledge should 

look like the following: 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

If you have any questions, please call Mincey Marble Customer Service at 800.533.1806 

Содержание FR-03

Страница 1: ...e to the panels and the walls If the foot rest ledge detaches physical injury to the occupant of the shower may occur Mincey Marble will not be liable for any damages to persons or property because of incorrect installation These instructions have been written for Mincey Marble s FR 03 cast marble wall mount foot rest ledge If you have a different product than shown please call us for instructions...

Страница 2: ...ght angle or ratcheting right angle screwdriver will make the installation easier 9 Three 10 x 3 Stainless Steel Truss Head Sheet Metal Screws provided by Mincey Marble to attach foot rest ledge to required wood blocking supplied by others These screws will be packaged with the foot rest ledge PLEASE NOTE There should be a minimum 2 x 6 pressure treated wood blocking in the wall behind the substra...

Страница 3: ... blocking in order to avoid damaging the cast marble panels The integral support of the foot rest ledge has a short side and a long side The short side of the foot rest ledge will be installed onto the back wall and the long side will be on the end wall of the enclosure Installing the Foot Rest Ledge with wood blocking 1 Measure the locations of the slots on the back of the foot rest ledge and tra...

Страница 4: ...o the wall ILLUSTRATION 3 4 Apply 100 silicone to the entire back of the foot rest ledge using a minimum bead of silicone This step cannot be skipped or avoided as the silicone adhesive is a necessary product in the installation of the foot rest ledge as the truss head screws are not designed to be a stand alone installation product 5 Slide the foot rest ledge over the Truss Head Screws and press ...

Страница 5: ...dge to the cast marble panels This seal should go around the entire perimeter of the foot rest ledge even under the bottom of the foot rest ledge DISCLAIMER NOTICE If the prescribed method of installation is not followed precisely the foot rest ledge may detach from the wall and cause damage to the panels and the walls If the foot rest ledge detaches physical injury to the occupant of the shower m...

Страница 6: ...t rest ledge you will need to have completed the installation of the panel system and sealed the seams of the shower panels behind where the foot rest ledge is to be installed with 100 silicone Installing the Foot Rest Ledge without wood blocking If the wood blocking has not been installed WingIt model MAW35 SD fasteners should be ordered to install the foot rest ledge See drawing A They can be or...

Страница 7: ... rest ledge once installed must be even with the top of the 1 1 2 band of the cast marble panels so the location of the drilled holes is critical in order to maintain alignment of the foot rest ledge to this band See illustration 2 ILLUSTRATION 1 ILLUSTRATION 2 2 Use stud finders to locate studs You must avoid studs in order for the WingIt to work When you are not positive of where the stud is dri...

Страница 8: ...n put onto the wall ILLUSTRATION 3 5 Apply 100 silicone to the entire back of the foot rest ledge using a minimum bead of silicone This step cannot be skipped or avoided as the silicone adhesive is a necessary product in the installation of the foot rest ledge as the truss head screws are not designed to be a stand alone installation product 6 Slide the foot rest ledge over the Truss Head Screws a...

Страница 9: ... silicone to cure before weight is applied to the foot rest ledge No weight should be applied to the foot rest ledge during this 48 hour period If the foot rest ledge is used before the allotted 48 hours all warranties will be void DISCLAIMER NOTICE If the prescribed method of installation is not followed precisely the foot rest ledge may detach from the wall and cause damage to the panels and the...

Отзывы: