Instruction Manual
SECTION 2 - INSTALLATION
2.5 OIL FILLING INSTRUCTIONS
Although all pump mounted stroke controls are
factory filled with hydraulic oil and operated before
shipment, it is advisable to check the oil level in
the hydraulic oil reservoir before placing unit in
operation. This level can be checked, and filled if
required in the following manner:
1. Adjust instrument air signal to position the piston
in the pump-mounted plastic cylinder to its 100%
position.
2. Shut OFF the supply air, then shut OFF the
instrument air to the unit. The 100% position
will be maintained.
3. Remove the filler plug
(Drawing 102209500020
on page 12)
on the top of the reservoir and
note the 1/8”(3 mm) diameter tube located in
the opening below the plug. When filling the
reservoir do not pour oil onto or into this small
tube.
4. Fill the reservoir with any light oil (SAE 5 or
SAE 10) (32 to 72 kPa) until the oil level is
within one inch (25 mm) below the top edge of
the small tube.
5. Install the oil fill plug and readjust air supply to
80-100 psi (551-689 kPa).
6. Adjust the control between the maximum and
minimum instrument air signals several times to
allow the oil to enter and fill the chamber behind
the piston and the system passages.
7. Repeat first five steps to insure that the reservoir
is filled to within 1” (25 mm) of the top of the
small tube when control is at the 100% capacity
position.