1\YW^<UfU\Q^TCUddXU@bUcc
Support the press on shims placed under the outer ends of the X-shaped footing while aligning
and leveling.
1\YW^
Locate the press with respect to the Milnor
CBW
®
tunnel washer or the Milnor Cobuc
conveyor it receives goods from, as shown in the
interface drawing (see Table of Contents). Verify
that the tunnel exit ring or Cobuc bucket when in
the discharge position is centered in the press
scupper or load door (see FIGURE 2). Reposition
the press slightly, if required.
<UfU\
Level the press right to left and front to rear
using a carpenter’s level placed on the press bed.
Reposition the press slightly, if required.
CUd
The press must be supported under the entire length of its X-shaped footing and anchored to
prevent creeping. To accomplish both objectives, form and pour a grout bed that imbeds one to two
inches of the footing, as shown in FIGURE 3. Use Sonneborn 14K or equivalent high flow, high
precision (fills all voids), non-shrinking, non-metalic, cementious grout.
586DA4 !) 1\YW^Y^W dXU @bUcc GYdX dXU <_QTY^W 4UfYSU
586DA4 ") 7b_edY^W dXU @bUcc
9>CD1<<1D9?>±D@!& 'hh @B5CC
=C9> ) (15)'!#1F " _V !!
6
Содержание TP1607 Series
Страница 4: ......
Страница 6: ...2 ...
Страница 7: ...Chapter 1 Installation 3 ...
Страница 8: ...4 ...
Страница 20: ...16 ...
Страница 21: ...Chapter 2 Functional Description 17 ...
Страница 22: ...18 ...
Страница 33: ...Chapter 3 Service and Maintenance 29 ...
Страница 34: ...30 ...
Страница 45: ...Chapter 4 Dimensional Drawings 41 ...
Страница 46: ...42 ...
Страница 47: ...43 ...
Страница 48: ...44 ...
Страница 49: ...45 ...
Страница 50: ...46 ...