#& # $" #"6hh GQcXUb 5hdbQSd_b 9^cdQ\\QdY_^
@5<<5B9> =9<>?B 3?B@?B1D9?>
are part of the machine structure.
• Vibration safety switch restraint.
#
BTccX]V?a^RTSdaTb
To protect against lateral creeping of the machine during operation (due to vibration),
roughen the area of the floor where the grout will be applied. Anchor bolts are required.
1. With the machine near the final location, unbolt the shipping skids. Observing all
precautions, lift the machine off its skids and lower the machine onto blocking. Shim the
blocking until the machine is level and approximately l" (25) clearance exists under each base
pad. Install anchor bolts as shown on the dimensional drawing, but do not tighten bolts until
grout is completely dry.
2. Apply grout between the existing foundation floor and the base pads, observing the following
considerations:
• Use only industrial strength non-shrinking grout. Pack or trowel by hand.
• If the grout after mixing is too thin (causing it to flow from under the base pads) install
temporary cardboard framing around pads to retain the grout until it cures.
20DC8>= " ) EXQaPcX^] P]S <P[Ud]RcX^] 7PiPaS—Voids under the base pads can
magnify vibration and cause unsatisfactory operation.
• Grout must displace total clearance between base pads and existing foundation
floor.
• Voids must not exist.
3. Tighten anchor bolts evenly using only one-quarter turn on each bolt before moving to the
next one. While tightening, frequently skip from front to back and right to left to insure
uniform tension. After tightening all bolts, check each bolt at least twice during the first week
of operation.
$
1TU^aTAd]]X]V<PRWX]T
20DC8>= # ) <PRWX]T 3P\PVT 7PiPaS—Machine can be damaged if shipping restraints
are improperly utilized. These include various bolts, brackets, weldments and safety stands
(painted red), and the vibration safety switch (tie wrapped).
• DO NOT remove shipping restraints until installation is complete.
• DO remove all shipping restraints before operating machine.
%
"%"5g9P]SBcP_W6dPaS<PRWX]Tb
• Remove the red locking bolts from the front and back of the shell.
• Remove the red shipping bracket stands.
• Remove the tie wrap that secures the vibration safety switch.
• Check the perforated cylinder for smoothness before placing machine in service. Milnor
cannot accept cylinder finish damage claims after machine is in service.
&
#!"!5g95gFP]S5g?FPbWTa4gcaPRc^ab
These machines are shipped with the shell locked to the mid frame by four hold down ring
weldments (two per side). Each weldment consists of a cone and cup arrangement (Figure 4).
24
Содержание 36030
Страница 4: ......
Страница 12: ...Safety Suspended Open Pocket Non tilting Washer Extractors PELLERIN MILNOR CORPORATION End of BIUUUS27 8 ...
Страница 25: ...Section 1 Installation 21 ...
Страница 32: ...28 ...
Страница 33: ...Section 2 Dimensional Drawings 29 ...
Страница 34: ...30 ...
Страница 35: ...31 ...
Страница 36: ...32 ...
Страница 37: ...33 ...
Страница 38: ...34 ...
Страница 39: ...35 ...
Страница 40: ...36 ...
Страница 41: ...37 ...
Страница 42: ...38 ...
Страница 43: ...39 ...
Страница 44: ...40 ...
Страница 45: ...41 ...
Страница 46: ...42 ...
Страница 47: ...43 ...
Страница 48: ...44 ...
Страница 49: ...45 ...