3.2.1.2. PROPPING WITH TOWERS
This propping model services most of the periphery beams, since they do not fit in the propping
with crossheads or T supports, as already mentioned.
However, the propping with towers does not restrict the use of struts for breaking the main beams
spans.
All propping of the outer beams with
towers positioned with eccentricity (partial
or total) should be guyed. This guying
should be done in order to prevent the
movement of the secondary beamwork.
Back view of a periphery beam propped
with towers.
Notice that the guying is repeated all
along the beam’s length.
▼
▲
In order to find out about the tying of steel wire
ropes, please consult the Steel Wire Ropes
internal maintenance manual.
Side view of a periphery beam
propped with towers.
▼
The guying steel wire
ropes should be tied with
clamps according to the
standard in force.
Mills does not supply the guying and it
is the responsibility of the contractor.
Содержание TS MILLS
Страница 1: ...TS MILLS USE MANUAL Infrastructure...
Страница 2: ...USE MANUAL TSMILLS...
Страница 4: ......
Страница 5: ......
Страница 10: ......
Страница 137: ......
Страница 138: ...NATIONAL ENGINEERING...