![Miller Big Blue 300 PRO Series Скачать руководство пользователя страница 64](http://html1.mh-extra.com/html/miller/big-blue-300-pro-series/big-blue-300-pro-series_owners-manual_1795938064.webp)
OM-259 355 Page 60
SECTION 11
−
RUN-IN PROCEDURE
run_in1 2007
−
04
11-1. Wetstacking
1
Welding Generator
Run diesel engines near rated volt-
age and current during run-in period
to properly seat piston rings and
prevent wetstacking. See name-
plate, rating label, or specifications
section in this manual to find rated
voltage and current.
NOTICE
−
Do not idle engine longer
than necessary. Piston rings seat
faster if engine runs at weld/power
rpm, and the welding generator is
kept loaded during run-in.
2
Engine Exhaust Pipe
Wetstacking is unburned fuel and
oil in the exhaust pipe and occurs
during run-in if the engine is run too
long at light load or idle rpm.
If exhaust pipe is coated with a wet,
black, tar-like substance, dry the
engine using one of the following
run-in procedures.
See the engine manual for addition-
al engine run-in information.
2
1
NOTICE
−
Do not perform run-in
procedure at less than 20 volts
weld output and do not exceed duty
cycle or equipment damage may
occur.
Содержание Big Blue 300 PRO Series
Страница 33: ... Complete Parts List is available at www MillerWelds com OM 259 355 Page 29 Notes ...
Страница 40: ... Complete Parts List is available at www MillerWelds com OM 259 355 Page 36 6 7 Fuel Hour Gauge Descriptions ...
Страница 51: ... Complete Parts List is available at www MillerWelds com OM 259 355 Page 47 Notes ...
Страница 59: ...OM 259 355 Page 55 240 670 C ...
Страница 60: ...OM 259 355 Page 56 Figure 10 2 Circuit Diagram For Welding Generator With Kubota Engine ...
Страница 61: ...OM 259 355 Page 57 253 845 B ...
Страница 62: ...OM 259 355 Page 58 Figure 10 3 Circuit Diagram For Welding Generator With Mitsubishi Engine ...
Страница 63: ...OM 259 355 Page 59 250 149 B ...
Страница 74: ...OM 259 355 Page 70 Notes ...