OM-173 413 Page 17
SECTION 4 – INSTALLATION
4-1.
Installing Welding Generator
install1 3/96 – Ref. ST-800 652 / Ref. ST-800 477-A / ST-158 936-A / S-0854
1
2
Electrically bond generator frame to
vehicle frame by metal-to-metal
contact.
GND/PE
3
4
1
Generator Base
2
Metal Vehicle Frame
3
Equipment Grounding
Terminal
4
Grounding Cable
Use #10 AWG or larger insulated
copper wire.
If unit does not have GFCI re-
ceptacles, use GFCI-
protected extension cord.
2
OR
18 in
(460 mm)
18 in
(460 mm)
18 in
(460 mm)
18 in
(460 mm)
18 in
(460 mm)
OR
Movement
Airflow Clearance
Location
Grounding
OR
Do Not Lift Unit From End
Содержание Big Blue 401DXQ
Страница 32: ...OM 173 413 Page 28 6 2 Maintenance Label ...
Страница 39: ...OM 173 413 Page 35 SECTION 8 ELECTRICAL DIAGRAM SC 190 651 A Figure 8 1 Circuit Diagram For Welding Generator ...
Страница 60: ......
Страница 61: ......
Страница 62: ......