OM-4428 Page 24
5-4. Installing Exhaust Pipe
1/2 in
Tools Needed:
Ref. 803 604 / Ref. 215 664
!
Stop engine and let cool.
Point exhaust pipe in desired di-
rection but always away from front
panel and direction of travel.
ether1 7/96
−
153 382-A / Ref. 215 664
!
Stop engine.
!
Improper handling or expo-
sure to ether can harm your
health. Follow manufactur-
er’s safety instructions on
cylinder.
!
Do not use Ether Starting Aid
while engine is running.
Remove rubber access plug from
cover.
1
Ether Cylinder
2
Nozzle
Remove cover and clean cylinder
nozzle.
3
Clamp
4
Fitting
5
Cap
6
Valve
Remove cap and clean fitting.
Install cylinder on fitting. Tighten
clamp.
After installing cylinder, wait at
least 10 minutes before using
to let ether particles settle and
prevent atomizer plugging.
Put cap on fitting when cylinder is
removed.
Reinstall plug in cover.
1
2
3
4
6
5
5-5. Installing Optional Ether Cylinder (Deutz F3L912 Engine Only)
Содержание 600 X
Страница 17: ...OM 4428 Page 13 3 2 Manufacturer s Rating Labels CC Models CC CV Models...
Страница 67: ...OM 4428 Page 63 215 221 E...
Страница 68: ...OM 4428 Page 64 Figure 12 2 Circuit Diagram For CC Welding Generator Deutz F4L2011 Powered Units Export Models...
Страница 69: ...OM 4428 Page 65 235 275 A...
Страница 70: ...OM 4428 Page 66 Figure 12 3 Circuit Diagram For CC CV Welding Generator Deutz F4L2011 Powered Units...
Страница 71: ...OM 4428 Page 67 215 806 E...
Страница 73: ...OM 4428 Page 69 235 276 A...
Страница 74: ...OM 4428 Page 70 Figure 12 5 Circuit Diagram For CC Welding Generator Deutz F3L912 Powered Units...
Страница 75: ...OM 4428 Page 71 215 807 D...
Страница 76: ...OM 4428 Page 72 Figure 12 6 Circuit Diagram For CC CV Welding Generator Deutz F3L912 Powered Units...
Страница 77: ...OM 4428 Page 73 215 808 D...
Страница 106: ......