Milandr, Inc.
Milur 107 Operation Manual
Operational Manual for Milur 107 Smart Meter
Page 5 of 16
MILUR
107
SMART
ELECTRIC
METER
Safety Information
Safety Information
1.
Before operation, it is necessary to familiarize yourself with the
operational documentation of the meter.
2.
All work regarding the installation, maintenance and repair of the
meter should be done by persons who have received safety training
and who have worked with a voltage of up to 1000 V.
3.
All work related to the installation of the meter must be carried
out on a disconnected network. The circuit breaker should be easily
accessible, located in the immediate vicinity of the meter and
included in the installation of the electrical wiring of the facility.
NOTE
-
Installation should always be performed by a qualified electrician.
The bus wire and interface connecting diagrams are printed inside the
covers.
Please contact us with any additional installation or maintenance
questions; The detailed specifications, installation and programming
instructions are available online at: www.milur.com
Conditions of Use
1.
The voltage applied to the meter must not exceed 265V.
2.
The current in the meter's series circuit must not exceed the
specified maximum value of 80 A.
3.
Remove the meter from its packaging and perform an external
inspection.
4.
Make sure that there is no visible damage to the body or
protective covers for the terminal blocks. Check for the
presence and quality of the seals.
5.
Install the meter at the place of operation, remove the
protective covers of the terminal blocks and connect the
voltage and current circuits in accordance with the scheme on
the protective cover.
NOTE
- The connection of the internal installation meter to the mains must be
carried out via switch in the immediate vicinity of the meter in an easily accessible
place for the operator. The switch must be marked as a trip device for the meter.
ATTENTION:
connection of voltage and current circuits should be carried out with
the power supply de-energized.