background image

 

 

Milandr, Inc. 

Milur 107 Operation Manual 

 

Operational Manual for Milur 107 Smart Meter 

          Page 5 of 16 

 

 

 

 

 

MILUR

 

107

 

SMART

 

ELECTRIC

 

METER 

Safety Information  

Safety Information 

 
1. 

Before operation, it is necessary to familiarize yourself with the 

operational documentation of the meter. 

2. 

All work regarding the installation, maintenance and repair of the 

meter should be done by persons who have received safety training 

and who have worked with a voltage of up to 1000 V. 

3. 

All work related to the installation of the meter must be carried 

out on a disconnected network. The circuit breaker should be easily 

accessible, located in the immediate vicinity of the meter and 

included in the installation of the electrical wiring of the facility. 

 

NOTE 

-

 

Installation should always be performed by a qualified electrician. 

The bus wire and interface connecting diagrams are printed inside the 

covers. 

Please contact us with any additional installation or maintenance 

questions; The detailed specifications, installation and programming 

instructions are available online at: www.milur.com 

 

Conditions of Use 

1.

 

The voltage applied to the meter must not exceed 265V. 

2.

 

The current in the meter's series circuit must not exceed the 

specified maximum value of 80 A. 

3.

 

Remove the meter from its packaging and perform an external 

inspection. 

4.

 

Make sure that there is no visible damage to the body or 

protective covers for the terminal blocks. Check for the 

presence and quality of the seals. 

5.

 

Install the meter at the place of operation, remove the 

protective covers of the terminal blocks and connect the 

voltage and current circuits in accordance with the scheme on 

the protective cover. 

 
NOTE 

- The connection of the internal installation meter to the mains must be 

carried out via switch in the immediate vicinity of the meter in an easily accessible 
place for the operator. The switch must be marked as a trip device for the meter. 

 
ATTENTION:

 connection of voltage and current circuits should be carried out with 

the power supply de-energized.

 

 

 

Содержание MILUR 107

Страница 1: ...lation Usage technical information and maintenance The Instruction Manual Contains Description of the Meter and its components Technical Specifications and other information necessary to ensure capabi...

Страница 2: ...CONTENTS 1 Product Description 2 Technical Details 3 Safety Information 4 Conditions of Use 5 Environmental Considerations 6 Installation Procedure 7 Manual Operation 8 Remote Operation 9 Measures to...

Страница 3: ...Meter with reduced terminal covers requires additional protection from direct water ingress The measuring unit of the outdoor meter has an IP20 degree of protection The Meter is intended for the orga...

Страница 4: ...ve energy reactive energy 0 02 0 025 Operating Temperature range F indoor Installation outdoor Installation 40 to 158 58 to 158 Number of tariffs Up to 4 Accuracy of the build in clock with the meter...

Страница 5: ...y additional installation or maintenance questions The detailed specifications installation and programming instructions are available online at www milur com Conditions of Use 1 The voltage applied t...

Страница 6: ...connect the voltage and current circuits in accordance with the scheme shown on the protective cover 4 Connecting the internal installation meter to the mains produce through a switch located in the i...

Страница 7: ...e sure that the meter has turned on On the meter s display the active energy consumption instantaneous values of current capacity network voltage current time and date are displayed If there is a load...

Страница 8: ...e by pressing one of the buttons Upon power up the meter measures the power determines the tariff number according to the tariff schedule of the current or holiday day of the week starts to register e...

Страница 9: ...mm ss Where hh hours 00 23 minutes 00 59 ss seconds 00 59 When time is displayed the word time is displayed on the screen The power value is displayed in the following format X X Where XXXXXX XX is th...

Страница 10: ...in the LCD display Third Display Cycle The following options are displayed in the third display cycle Instantaneous value of active power Instantaneous reactive power Instantaneous full power Instanta...

Страница 11: ...the displayed voltage value is Volt In this case the indicator on the LCD displays the V and P1 symbols The network address of the Meter is displayed in the format P2 Where XXX is a byte decimal numbe...

Страница 12: ...Meter is established after specifying the corresponding fields of the Meter address program access level password level access and the number of the virtual COM port on which the converter was instal...

Страница 13: ...ck time is programmable through available interfaces Each Meter is given the following default passwords and addresses The password of the first level FF FF FF FF FF FF 255 255 255 255 255 255 The pas...

Страница 14: ...ontrol To perform this function the impulse output of active energy can be transferred to three additional modes load on load off and automatic control When the load on function is selected the pulse...

Страница 15: ...from the meter surface by a clean soft wipe rag To check the reliability of the power and interface circuits of the meter you need to Remove the seals from the protective covers of the terminal block...

Страница 16: ...C16 To verify the integrity of the software and its compliance it is provided a unique identification Identification is carried out by an external Milur Meter Configurator software via communication i...

Отзывы: