Maintenance

 

List of maintenance work, as well as frequency maintenance are 
given in table 5. 

 

Таble 5 

List of Maintenance Work 

Periodicity 

Dust  Removal  form  the  housing  and 

front of the meter

 

Checking the reliability of 

power and interface chains of 

the meter 

Checking the voltage on the 

built-in lithium battery 

Function Check 

*             In accordance with the schedule of preventive maintenance of 

the operating organization 

 

ATTENTION: THE WORK MUST BE CONDUCTED WITH A 

CONNECTED NETWORK! 

 

The dust should be removed from the meter surface by a clean, soft 

wipe rag. To check the reliability of the power and interface circuits 

of the meter you need to: 

 

Remove the seals from the protective covers of the terminal 

blocks, and unscrew the fastening screws and remove the 

protective covers;  

 

Remove dust from the terminal blocks with a brush;  

 

Tighten the screws of the terminal block to fixing the power 

and interface wires chains;  

 

Install the protective cover of the terminal block, fix it with 

two screws and to seal.  

The meter has a 3.6 V lithium battery type CR2032, providing long 

lasting, reliable power. The meter periodically checks the battery 
voltage. If the battery voltage falls below 2.6 V, the LCD display with 

a frequency of 0.5 Hz, and the battery indicator symbol flashes.  

In this case the battery must be replaced. 

Содержание MILUR 107

Страница 1: ...lation Usage technical information and maintenance The Instruction Manual Contains Description of the Meter and its components Technical Specifications and other information necessary to ensure capabi...

Страница 2: ...CONTENTS 1 Product Description 2 Technical Details 3 Safety Information 4 Conditions of Use 5 Environmental Considerations 6 Installation Procedure 7 Manual Operation 8 Remote Operation 9 Measures to...

Страница 3: ...Meter with reduced terminal covers requires additional protection from direct water ingress The measuring unit of the outdoor meter has an IP20 degree of protection The Meter is intended for the orga...

Страница 4: ...ve energy reactive energy 0 02 0 025 Operating Temperature range F indoor Installation outdoor Installation 40 to 158 58 to 158 Number of tariffs Up to 4 Accuracy of the build in clock with the meter...

Страница 5: ...y additional installation or maintenance questions The detailed specifications installation and programming instructions are available online at www milur com Conditions of Use 1 The voltage applied t...

Страница 6: ...connect the voltage and current circuits in accordance with the scheme shown on the protective cover 4 Connecting the internal installation meter to the mains produce through a switch located in the i...

Страница 7: ...e sure that the meter has turned on On the meter s display the active energy consumption instantaneous values of current capacity network voltage current time and date are displayed If there is a load...

Страница 8: ...e by pressing one of the buttons Upon power up the meter measures the power determines the tariff number according to the tariff schedule of the current or holiday day of the week starts to register e...

Страница 9: ...mm ss Where hh hours 00 23 minutes 00 59 ss seconds 00 59 When time is displayed the word time is displayed on the screen The power value is displayed in the following format X X Where XXXXXX XX is th...

Страница 10: ...in the LCD display Third Display Cycle The following options are displayed in the third display cycle Instantaneous value of active power Instantaneous reactive power Instantaneous full power Instanta...

Страница 11: ...the displayed voltage value is Volt In this case the indicator on the LCD displays the V and P1 symbols The network address of the Meter is displayed in the format P2 Where XXX is a byte decimal numbe...

Страница 12: ...Meter is established after specifying the corresponding fields of the Meter address program access level password level access and the number of the virtual COM port on which the converter was instal...

Страница 13: ...ck time is programmable through available interfaces Each Meter is given the following default passwords and addresses The password of the first level FF FF FF FF FF FF 255 255 255 255 255 255 The pas...

Страница 14: ...ontrol To perform this function the impulse output of active energy can be transferred to three additional modes load on load off and automatic control When the load on function is selected the pulse...

Страница 15: ...from the meter surface by a clean soft wipe rag To check the reliability of the power and interface circuits of the meter you need to Remove the seals from the protective covers of the terminal block...

Страница 16: ...C16 To verify the integrity of the software and its compliance it is provided a unique identification Identification is carried out by an external Milur Meter Configurator software via communication i...

Отзывы: