MIKOTERM eCompact Plus 12kW Скачать руководство пользователя страница 20

 

 

 

Electric connecting 

 

Image 13:

 Boiler electric scheme 

eCompact Plus

 with nominal power of 

9

kW and 

12

kW

 

Содержание eCompact Plus 12kW

Страница 1: ...Guidebook for installation handling and maintenance ENG eCompact Plus Electric block boiler for heating systems with thermoregulatory microprocessor FG eCompactPlus 01 2020...

Страница 2: ...on air emission 5 Electrical connection 5 1 Positions of introducer for the introduction of the power cable 5 2 Connecting power voltage cable 5 3 Scheme for connecting power voltage cable 5 4 Connect...

Страница 3: ...assembly All electric works should be performed by authorised person in accordance with corresponding regulations Commissioning and maintenance and repairs should be done by authorised service only Te...

Страница 4: ...o spare parts not delivered by the manufacturer Use only original spare parts Material damages due to freezing When there is damage due to freezing drain water from the boiler tank and pipelines for h...

Страница 5: ...ax pressure of 2 6bar which should be controlled on regular basis Boiler should be handled only by adults who are familiar with instructions and work of the boiler Do not close safety valve Inflammato...

Страница 6: ...lyurethane polystyrene polyethylene floor fibre materials Table 2 Ignitable materials and composition of elements according to DIN 4102 2 8 Product description Basic components of boiler Boiler body D...

Страница 7: ...nt 11 Automatic fuses with voltage trigger 12 Terminal for room thermostat 13 Microprocessor plate 14 Heater relay 9 18kW contactor 24 27kW 15 Temperature sensor 16 Safety thermostat STB 17 Control pa...

Страница 8: ...is damaged during delivery Check if delivery is complete Part Pieces Boiler eCompact Plus 1 Assembly Set 1 Instructions for handling 1 2 11 Factory plate Factory data plate is placed on the external...

Страница 9: ...2 12 Dimensions and technical data 2 12 1 Dimensions and technical data for boiler Image 2 Dimensions and connection Device data...

Страница 10: ...cable cross section for three phase power supply mm 5 2 5 5 2 5 5 4 5 4 5 6 5 6 Needed fuses for single phase supply voltage A 1 32 1 50 Minimum cable cross section for single phase power supply mm 3...

Страница 11: ...carts for bags with tighten strip The product should be in horizontal position during transportation Avoid shocks or collisions Packed boiler put on carts for bags if needed secure it with strip and...

Страница 12: ...ulations and local laws Electric connector should be done according to the connecting plans After corresponding installation of device execute grounding of the plant Before opening device and all work...

Страница 13: ...dowel enclosed in device packaging or adequate dowel for unusual kind of wall Then screw bolts into delivered dowels or other in such way that are left out from the wall min 5 mm max 10mm Carefully ha...

Страница 14: ...shines near the mark bar 4 7 1 Filling the boiler with heating water and sealing test Waterproof should be tested prior to put on the boiler 1 Check pre pressure of expansion dish If is pressure leve...

Страница 15: ...set is on lower side below of device They are on lower plate of device in the back left corner image 6 It is intended for connecting device when power cable comes from the lower side of the boiler II...

Страница 16: ...nnected to three pole fusses L1 L2 and L3 When introducing a power cable into the boiler through any selected set of glands carefully patch the cable to the three pole automatic fuses to avoid damagin...

Страница 17: ...of digital programmable room thermostat with battery supply Image 9 Scheme of boiler connecting on three phase power supply Image 8 Scheme of boiler connecting to single phase power supply ONLY FOR P...

Страница 18: ...boiler of 12 18kW 3 2667W for boiler of 24kW 3 3000W for boiler of 27kW G3 Heater 3 2000W for boiler of 18kW 3 2667W for boiler of 24kW 3 3000W for boiler of 27kW LCTR 2 Microprocessor thermoregulato...

Страница 19: ...Electric connecting Image 12 Boiler electric scheme eCompact Plus with nominal power of 6kW...

Страница 20: ...Electric connecting Image 13 Boiler electric scheme eCompact Plus with nominal power of 9kW and 12kW...

Страница 21: ...Electric connecting Image 14 Boiler electric scheme eCompact Plus with nominal power of 18kW 24kW and 27kW...

Страница 22: ...on Prior to turn on check if heating installation is filled with water and air vent Turn on main switcher below device Heating system and device parameters will appear on display Device is adjusted by...

Страница 23: ...l 7 2 2 Basic adjustments The current temperature is continuously displayed on the display indicating the LED that is lit beside the Temp mark To display other parameters use the keys and In addition...

Страница 24: ...Each touch to the button will increase decrease given temperature of the boiler for 1 C Working temperature range is 10 C 80 C Confirmation of change must be done by pressing button SET If change is...

Страница 25: ...urns off all heaters and pump delayed for 2 min and pressure measuring indicator starts to flash quickly Display still shows present temperature of the boiler image 19 It is necessary to reduce pressu...

Страница 26: ...ays for 2 min and temperature measuring indicator will flash quickly image 22 With this temperature value there is danger of freezing and boiler damage so the work of this device will be blocked To co...

Страница 27: ...T 100 C display of its value is not possible to see on the screen so in this will appear code EH meaning that temperature is T 100 C image 26 Measuring temperature indicator will continue to flash qui...

Страница 28: ...g T 2 C or upper limit T 89 C of temperature of the heating system Measure Turn off electric power supply for the boiler Call service Graphic display of the area of blockade of the boiler work conditi...

Страница 29: ...manufacturer instructions 7 3 8 Heating discontinuity With short time discontinuity of heating working regime the boiler temperature must be decreased using thermo regulator of the boiler To prevent...

Страница 30: ...elivered by the manufacturer Control examination log is provided on chapter 8 4 Perform works in accordance with log on control and maintenance All deficiencies remove immediately 8 1 Boiler cleaning...

Страница 31: ...heck if there is any damage on electric duct lines 6 Check if electric control connections and used elements are fitted tighten it if needed 7 Check thermo regulator on boiler 8 Check function of safe...

Страница 32: ...economy concepts we use only the best technique and materials Packaging Regarding packaging we respect system of recycling which is specific in certain states and which secure optimal recycling All m...

Страница 33: ...amaged Check all three phases Check set power of boiler Change damaged part Change damaged part Boiler heats but it is very noisy Higher level of noise during work Air in the system Small water flow P...

Страница 34: ...lector Button settings 9 Drain faucet Wilo Para MSL 6 43 SC is a circulating pump for heating systems heating systems for family houses and other similar systems The most important characteristics of...

Страница 35: ...ess and hold the operating button for atleast 4 seconds All LEDs flash for 1 second The LEDs for the last setting flash for 1 second Decommissioning Shutting down the pump Shut down the pump immediate...

Страница 36: ...precautions for assembly installation and maintenance are described in the operating and installation instructions Read and follow the operating and installation instructions 10 All of the data that...

Страница 37: ...Note...

Страница 38: ...cted by intellectual property of MIKOTERM d o o Any unauthorized use copying or publication in whole or in part by other entities without the authorization of MIKOTERM d o o is punishable by law Nis 2...

Отзывы: