3.

 

Installation 

 

 

After preparation for mounting, the device is to be placed in the designated room in accordance with the 

system structure. 

 

All inlets and outlets are to be connected on t

he water‟s side. The device connections are 

shown in the 

following figure:  

·

 

Connect the inlet (1) and outlet (2) to water supply; 

·

 

Connect the elastic pipe (1/2‟) draining the sewage to the stub connector pipe (

3) and to a sewage 

grating or a draining installation. 

·

 

The sewage draining should be permeable enough to drain 5l/m of the flushing water. The draining 
pipe should be stiff enough to avoid its breaking, which may cause blockage and result in the 
overflow in the tank with the reagent as well as faulty regeneration process; 

·

 

Before water softener should be used mechanical sediment filter to protect device from mechanical 
damage caused by sediments from water pipes.  

 

The brine tank of the water softening device is to be filled with salt tablets (max. filling 100 mm from 

the upper edge of the brine tank). Next add 5 liters of water using buckets. 

 

Check and tighten all fittings connecting the device. 

 

Connect to electric Power socket. 

 

The device is factory adjusted. The 

fine tuning 

is done by the user on site.

 

 

Program the steering valve (

see point 3.2

)

 

 

Before  launching  the  current  time  should  be  set  and  the  number  of  m

3

  to  flow  after  which  the 

regeneration is to start. 

 

 

Valve is pre-set for intelligent regeneration (down-flow) A-03 (description on page 11)

 

 

The  Valve  is  preset  for  the  regeneration  at  2  a.m.  every  975  liters  (0,975  m

3

)  for  the  water 

hardness  of  20  GH  German  degrees.  Depending  on  the  water  hardness  set  the  appropriate 
number of liters to flow after which the regeneration is to start (Examine the water hardness and 
use the table from the page 5) and set the regeneration time. 

 

Open the 

water supply 

to the water softening device. 

 

The 

water pressure 

must be at least 2,0 bars and a maximum of 6,0 bars. 

 

Initiate  regeneration  by  pressing 

  button  You  will  hear  the  humming  of  an  electric  engine,  which 

means  that  device  driver  has  started  its  regeneration.  During  the  regeneration  process  the  system  de-
aerates and refills the reagent tank with water. Once the regeneration is over, the device is ready to work 
again. During the regeneration hard water is available. 

 

While programming it is 

not allowed

 to change : Backwash, Brine and Slow Rinse, Refilling and Fast 

Rinsing settings in the 

Advanced Settings

 stage. These are the manufacturing settings for the Softener 

VE system; in case they are changed the system will not work properly and manufacturer shall not be 
held liable for the consequence of incorrect operation of the system . 

 

The system has been programmed in A-03 regeneration mode 

 the intelligent, logical regeneration. On 

the basis of the water use from the last 7 days the system itself chooses the day of regeneration at the 
pre-set time. 

 
  

Picture 2. Steering valve 
description. 

 

1.

 

Inlet of raw water 
(3/4", elastic 
connection) 

2.

 

Outlet of treated 
water (3/4", 
elastic 
connection) 

3.

 

Drain (1/2", 
elastic 
connection).  

4.

 

3/8" brine tank 
connection  

5.

 

Flow meter insert 

 

Содержание MINIBOY VE

Страница 1: ...BEDIENUNGSANLEITUNG englisch Wasserenth rter Mini Boy VE KBS Gastrotechnik GmbH Johannes Kepler Str 14 55129 Mainz www kbs gastrotechnik de Stand November 2018...

Страница 2: ...ATED WATER SOFTENER STATION MINIBOY VE Installer Stamp Date of Installation Serial Number Please read the operating manual before startup The manufacturer is not responsible for malfunctions caused by...

Страница 3: ...nd statutory regulations 4 1 Description of the device 4 1 1 System structure 4 1 2 Technical description 5 1 3 Control function 6 2 Preparation for installation 6 2 1 Installation preparation plan 6...

Страница 4: ...13 The proper name and serial number of the device must be provided with any enquiries and ordering of spare parts Only then an effective and quick reply or order implementation is ensured Transporta...

Страница 5: ...g 5 min Standards provisions and statutory regulations 1 Water supplying the device must comply with the requirements of the utility water use regulation 2 Parts that are in contact with treated water...

Страница 6: ...oy VE Water hardness English degree French degree PPM German degree Efficiency MiniBoy VE 12 5 18 178 6 10 1950 13 8 19 8 196 5 11 1773 15 21 6 214 3 12 1625 16 3 23 4 232 2 13 1500 17 5 25 2 250 14 1...

Страница 7: ...ed see figure on page 7 By turning a screwdriver counter clockwise increase the amount of tap water in the soft water Check the water hardness in the regulated soft water 2 Preparation for installatio...

Страница 8: ...for intelligent regeneration down flow A 03 description on page 11 The Valve is preset for the regeneration at 2 a m every 975 liters 0 975 m3 for the water hardness of 20 GH German degrees Depending...

Страница 9: ...ons reach Set Recharge Time regeneration hour press button and by using and buttons set the regeneration hour To confirm and save press button Next go to the step Set Residual Water system efficiency...

Страница 10: ...the minutes 3 Lastly press and hear a sound Di then finish adjustment 3 Pre Set L DO NOT CHANGE Set Gal L m3 DO NOT CHANGE 4 Pre Set A 03 Intelligent Down Flow DO NOT CHANGE Work Mode DO NOT CHANGE Mi...

Страница 11: ...00 35 about 2 8 liter 12 DO NOT CHANGE Fast Rinse Time DO NOT CHANGE DO NOT CHANGE FAST RINSE TIME FOR MINIBOY VE IS 05 00 13 Pre Set 30 days Can be changed Max Days Between Recharges 1 In advanced se...

Страница 12: ...wer failure during the filling of the brine tank Check power supply 2 Water is pouring through the top cover of the brine tank during regeneration Drain outlet from the steering valve is connected to...

Страница 13: ...ter regeneration check the amount of water in the brine tank there should be about 2 3 liters Improperly connected softener Check the softener connections IN raw water inlet OUT treated water outlet s...

Страница 14: ...the brine tank should always be above the water level Improperly connected softener Check the softener connections IN raw water inlet OUT treated water outlet see picture 2 page 7 Softener does not s...

Страница 15: ...nse cycle Power failure during refilling water in the brine tank Check power supply Improperly connected softener Check the softener connections IN raw water inlet OUT treated water outlet see picture...

Страница 16: ...water did not block the water system before the device Entrance to control valve contaminated with the rest of the installation works Remove all contamination and clean driver Contaminated pre filter...

Страница 17: ...utton This will allow the correct re regeneration Clogged drains too small hose to drain Clean outflow into drains and DLFC restrictor see picture 5 page 18 Water pressure drop or not enough water dur...

Страница 18: ...d to the wire for power outbound from the steering valve Put the Power adapter to the electrical socket and to the steering valve in the appropriate slot Incorrect supply voltage Connect the power sup...

Страница 19: ...99674 email export mijar eu www mijar eu Product card MINIBOY VE PRODUCT CARD Client s adress Date of installation Tested water hardneess Estimated efficiency Date Salt tablets verified supplemented P...

Отзывы: