
- 33 -
Note
1、Pressure maintaining valve connects with air intake, must be installed by
authorized and licensed technicians, to ensure interface tightness.
2、The pressure regulator(s) have connected, the maximum load of natural gas
cannot exceed 6”, and of LP cannot exceed 12”.
3、Adjustment range of the pressure regulator(s) is 3”-6”for natural gas, and
5”-12”for L.P..
11. Schematic diagram for installation of back panel
Step I
(Insert the inserted bar of
rear panel into the
corresponding position of
rear panel)
Step II
(Fix the inserted bar of rear panel
with the rear panel by
self-tapping screw)
Содержание C-RO-24G
Страница 8: ...7 4 2 36 inch series 7 8 1 2 3 8 1 2 7 8 1 4 1 8 3 8 7 8 1 2 3 8 1 2 7 8 1 4 1 8 3 8 C RO6 C RO4 12GR...
Страница 9: ...8 3 8 1 2 7 8 1 4 1 8 3 8 7 8 1 2 7 8 1 2 3 8 1 2 7 8 1 4 1 8 3 8 C RO4 12GL C RO2 24GR...
Страница 10: ...9 3 8 1 2 7 8 1 4 1 8 3 8 7 8 1 2 3 8 1 2 7 8 1 4 1 8 3 8 7 8 1 2 C RO2 24GL C RO 36G...
Страница 13: ...12 7 8 1 2 3 8 1 2 7 8 1 4 1 8 3 8 1 4 1 8 3 8 3 8 1 2 7 8 7 8 1 2 C RO6 12GR C RO6 12GL...
Страница 14: ...13 7 8 1 2 3 8 1 2 7 8 1 4 1 8 3 8 3 8 1 2 7 8 1 4 1 8 3 8 7 8 1 2 C RO4 24GR C RO4 24GL...
Страница 15: ...14 7 8 1 2 3 8 1 2 7 8 1 4 1 8 3 8 3 8 1 2 7 8 1 4 1 8 3 8 7 8 1 2 C RO2 36GR C RO2 36GL...
Страница 18: ...17 3 8 1 2 7 8 1 4 1 8 3 8 7 8 1 2 3 8 1 2 7 8 1 4 1 8 3 8 7 8 1 2 C RO8 12GL C RO8 12GR...
Страница 19: ...18 3 8 1 2 7 8 1 4 1 8 3 8 1 1 2 1 7 8 3 8 1 2 7 8 1 4 1 8 3 8 1 2 7 8 C RO6 24GR C RO6 24GL...
Страница 20: ...19 7 8 1 2 3 8 1 2 7 8 1 4 1 8 3 8 3 8 1 2 7 8 1 4 1 8 3 8 7 8 1 2 C RO4 36GR C RO4 36GL...
Страница 21: ...20 C RO2 48GL 7 8 1 2 3 8 1 2 7 8 1 4 1 8 3 8 3 8 1 2 7 8 1 4 1 8 3 8 7 8 1 2 C RO2 48GR...