Installation
*INSTALLATION*
78
Installation
Levelling the dryer
Ensure that no closeable door, slid-
ing door, or an oppositely hinged
door is installed that would hinder
the door of the dryer being opened in
any way.
The dryer must stand perfectly level to
ensure safe and proper operation.
The screw feet can be adjusted to com-
pensate for unevenness in the floor.
Downtime after installation
Damage to the tumble dryer by
switching it on too soon.
This can damage the heat pump.
After setting up the tumble dryer wait
for at least one hour before switching
it on.
Ventilation
The cool air intake at the front of the
tumble dryer must not be blocked or
covered. This would hinder a suffi-
cient intake of cool air for the heat
exchanger.
Do not block the gap between the
bottom of the tumble dryer and the
floor with plinth facings, deep pile
carpet etc. This would hinder a suffi-
cient flow of air to the tumble dryer.
The hot air that is blown out from the
heat exchanger warms the room air. En-
sure sufficient ventilation of the room:
e.g., open the window. The drying time
will otherwise take longer (higher energy
requirement).
Содержание TCR 860 WP
Страница 100: ......
Страница 101: ......
Страница 102: ......
Страница 104: ...M Nr 12 031 970 00 en GB TCR 860 WP ...