38
.1
5
en - US
Mat. NR. 09 883 210 / 0
2
Installation plan
Tumble dryer
PT 8807 EL
(Electrically heated)
Страница 1: ...38 15 en US Mat NR 09 883 210 02 Installation plan Tumble dryer PT 8807 EL Electrically heated ...
Страница 2: ...ioning or using the machine This avoids the risk of accidents or damage All rights reserved U S A Miele Inc National Headquarters 9 Independence Way Princeton NJ 08540 Phone Fax www mieleusa com Technical Service Support Nationwide Phone 800 991 9380 Fax 800 220 1348 proservice mieleusa com 800 991 9380 609 419 4241 ...
Страница 3: ......
Страница 4: ......
Страница 5: ......
Страница 6: ......
Страница 7: ......
Страница 8: ...must be provided on site A wall socket or main isolator must be accessible after installation Equipotential bonding Connection with male thread mm 10 35 with washers and nut M 10 Accessories not included If necessary equipotential bonding with good galvanic contact must be provided in accordance with all appropriate national and local regulations Peak load energy management Control contact voltage...
Страница 9: ...floating screed floor are to be provided on site mm 6 40 mm 10 50 On concrete platform 2 clamps 2 screws DIN 571 Ø length 2 rawl plugs Ø length The machine must be bolted to the floor Fixing materials for a floating screed floor are to be provided on site Machine data Unit width mm 1 206 47 Machine depth mm 1 384 54 Unit height mm 1 640 64 Casing width mm 1 200 47 Casing depth mm 1 279 50 Minimum ...