Initial commissioning
25
Completing the commissioning
process
The commissioning process is
complete when a program lasting
longer than 20 minutes has been
carried out in full.
If the power is interrupted prior to the
start of the first drying program (e.g., if
the machine is switched off with the
button), the initial commissioning
process can be completed again.
Once a drying program has been
running for over 20 minutes, the initial
commissioning process cannot be
performed again.
Confirm with
OK
.
In the main menu, touch
the
Programs
sensor control.
11:02
Automatic
plus
Timed drying
warm air
Basket - Low
temperature
Microfiber
Timed drying
cool air
Basket
program
Programs
Select the
Timed drying cool air
program.
Touch the
Duration
sensor control.
OK
00 20
02 59
01 58
01 21
02 22
Duration
h
11:02
Reset
Place your finger on the number that
you want to change and move your
finger in the direction you want.
Select a duration of 20 minutes.
Confirm with
OK
.
Touch the flashing
Start/Stop
sensor
control.
After this program has finished, the