Installation
*INSTALLATION*
59
Front view
a
Mains connection cable
b
Control panel
c
Door
d
Fluff filter
Do not open the cover during active
programme operation. Only open it if
you are prompted to do so by a mes-
sage in the display. Otherwise a tech-
nical fault can occur.
e
4 height-adjustable screw feet
f
Intake for air cooling
g
On-site ducting (installed on the right
or left-hand side)
Содержание PDR 908 EL Marine
Страница 94: ......
Страница 96: ...M Nr 11 115 170 00 en GB PDR 908 EL ...