![Miele PDR 507 HP Скачать руководство пользователя страница 87](http://html.mh-extra.com/html/miele/pdr-507-hp/pdr-507-hp_operating-and-installation-instructions_235020087.webp)
Supervisor level
87
Peak load signal
External hardware is connected via the
Miele XCI box.
The peak-load negotiation function
enables the tumble dryer to be
connected to an energy management
system. When a signal is registered,
the tumble dryer's heater is switched
off for a short period or the appliance
is prevented from being switched on.
The tumble dryer may only be
operated with a peak-load system if
this system is connected to the tumble
dryer via the Miele XCI Box.
– Factory setting: No function
– Peak load with 230 V
– Peak load with 0 V
Peak load prevention
With this function, the application of a
hygiene programme is not amended
when a peak load signal is in place.
The heater stays switched on.
– Factory setting: Off
– On
Payment system
External hardware is connected via the
Miele XCI box.
Settings for the payment system
If you wish to change the settings later,
please contact Miele.
You would like to connect a payment
system.
– No payment system
The next settings are skipped and
initial commissioning can be
completed.
– Programme operation
The machine is operated using a coin
box. The user purchases a wash
programme.
– Time operation
The tumble dryer is coin-operated
using a time meter. The user
purchases a time-controlled
programme.
– Timed operation with pulse counter
For payment systems where the
usage time is increased each time a
coin is inserted.
Содержание PDR 507 HP
Страница 90: ......
Страница 92: ...M Nr 11 420 910 00 en AU NZ PDR 507 HP ...