![Miele F 1411 Vi Скачать руководство пользователя страница 63](http://html.mh-extra.com/html/miele/f-1411-vi/f-1411-vi_operating-and-installation-manual_19748063.webp)
Preparing the water connection
The connection to the household
water supply must be installed
before the appliance is installed.
^
Turn off the main water valve to prevent
damage caused by leaking water.
^
Attach the connecting pipe to the
shut-off valve, according to the
instructions supplied by the
manufacturer of the ice cube maker
installation kit.
^
Install the connecting pipe. Always
observe the indicated clearance
dimensions to prevent damage to the
connecting pipe when pushing in the
appliance.
^
Secure the connecting pipe to the
floor with adhesive tape.
^
You may now proceed to install the
appliance. See "Installing the
appliance".
Plumbing
63
Содержание F 1411 Vi
Страница 42: ...42 ...
Страница 49: ...Niche dimensions A B F 1411 SF 18 469 8 mm 18 457 mm Dimensions 49 ...
Страница 69: ...69 ...
Страница 70: ...70 ...
Страница 71: ...71 ...