Service manual
- 28 -
8.7
Balance refrigerant of the 2-way, 3-way valves
Procedure:
1. Confirm that both the 2-way and 3-way valves are set to the open position.
2. Connect the charge set to the 3-way valve’s service port.
§
Leave the valve on the charge set closed.
§
Connect the charge hose with the push pin to the service port.
3. Open the valves (Low side) on the charge set and discharge the refrigerant until the gauge
indicates 0.05 to 0.1 Mpa.
§
If there is no air in the refrigeration cycle [the pressure when the air conditioner is not running is
higher than 0.1Mpa, discharge the refrigerant until the gauge indicates 0.05 to 0.1 Mpa. If this is the
case, it will not be necessary to apply a evacuation.
§
Discharge the refrigeration gradually; if it is discharged too suddenly, the refrigeration oil sill be
discharged.
Содержание MSG-24CR
Страница 1: ...MSG 24CR MSG 24HR MSG 30CR MSG 30HR MSG 36CR MSG 36HR...
Страница 2: ......
Страница 16: ...Service manual 12 5 Refrigerant cycle diagram Cooling only Heat pump mode...
Страница 18: ...Service manual 14 However excludes the initial pull down stage...
Страница 19: ...Service manual 15 7 Schematic diagram and Wiring diagram 7 1 Schematic diagram...
Страница 20: ...Service manual 16 7 2 Wiring diagram 7 2 1 Cooling mode MSG 24CR MSG 30CR...
Страница 21: ...Service manual 17 MSG 36CR...
Страница 22: ...Service manual 18 7 2 2 Heating mode MSG 24HR MSG 30HR A1 A2...
Страница 23: ...Service manual 19 MSG 36HR A1 A2...
Страница 24: ...Service manual 20 7 2 3 Cooling mode 3 Ph MSG 30CR 3ph...
Страница 25: ...Service manual 21 MSG 36CR 3ph...
Страница 26: ...Service manual 22 7 2 4 Heating mode 3 Ph MSG 30HR 3ph 1 7 3 4 5 6 2...
Страница 27: ...Service manual 23 MSG 36HR 3ph...