INSTALLATION LOCATION
CAUTIONS
1.Please avoid installing in the following places
A place with flammable gas or material.
A saline place such as a seashore vicinity
A place with sulphur gas.
A place with oil gas, such as kitchen.
A place with high-humidity air.
An unbearable place.
A place where high-frequency waves are generated.
2. Please comply with the related national electric standard to make electric insulation for
construction and metal parts of air-conditioner.
3. Please choose the place where the ventilation is good.
INSTALL INDOOR UNIT
Ceiling
1000mm
above
1000mm
above
Obstacle
(
Pipe side
)
Refrigerant Pipe
100mm
above
245mm
above
Ceiling
100mm
above
200mm
above
Air outlet side Air inlet side
MDV-D45~71Q
1
/BN
2
MDV-D28~36Q
1
/BN
2
INSTALL SPACE
2
0
0
m
m
a
b
o
v
e
Hanging screw bolt
distance 890
H
a
n
g
in
g
s
c
re
w
b
o
lt
d
is
ta
n
c
e
screw bolt distance 1230
MDV-D28~36Q
1
/BN
2
MDV-D45~71Q
1
/BN
2
s
c
re
w
b
o
lt
d
is
ta
n
c
e
3
3
0
5
3
0
2
Please install with
f
10 hanging screw bolts.
1. The
size
of
the ceiling to
be handled------ Do keep the
ceiling flat. Consolidate the roof beam for possible
vibration.
2. Cut off the roof beam.
3. Strengthen the place that has been cut off, and
consolidatethe roof beam.
4. Connect wires and pipes inside the ceiling after the air
conditioner is hanged.
Please refer to the following figure for the hanging
screw bolts distance
The handling to the ceiling varies from the constructions,
consult the construction person for the specific condition.