34
6).When the electronic scale displays the proper weight (refer to the table), disconnect the charge hose
from the 3-way valve’s service port immediately and turn off the air conditioner before disconnecting the
hose.
7). Mount the valve stem caps and the service port
Use torque wrench to tighten the service port cap to a torque of 18N.m.
Be sure to check for gas leakage.
6.5 Adding the refrigerant after running the system for many years
Procedure:
1). Connect the charge hose to the 3-way service port, open the 2-way valve and the 3-way valve.
Connect the charge hose to the valve at the bottom of the cylinder. If the refrigerant is R410A, make
the cylinder bottom up to ensure liquid charge.
2). Purge the air from the charge hose
Open the valve at the bottom of the cylinder and press the check valve on the charge set to purge the
air (be careful of the liquid refrigerant).
3) Put the charging cylinder onto the electronic scale and record the weight.
4) Operate the air conditioner at the cooling mode.
5) Open the valves (Low side) on the charge set and charge the system with liquid refrigerant.
Electronic scale
Содержание MA9A-24HR-QB4W
Страница 19: ...17 MS9A 18CR QB6...
Страница 20: ...18 MS9A 18CR PC4W A MS9A 05CR QD0 MS9A 09CR QB6 A MS9A 09CR QB6 MS9A 09CR QC0 MS9A 09CR QC4 A...
Страница 21: ...19 MS9A 12CR QC4 A MS9A 18CR QC0 MS9A 18CR QC2 MS9A 18CR QB8 MS9A 18CR QC4 A MS9A 18CR QC0 A...
Страница 22: ...20 MS9A 21HR QB6W MA9A 24HR QB4W MS9A 22CR QC0 MS9A 22CR QB8...
Страница 23: ...21 5 2 Outdoor Units MOK2 07C QB6 MOK6 09C QB6 MOA1 12C QB6 MOA2 12C QB6...
Страница 24: ...22 MOB 18C QB6...
Страница 25: ...23 MOK 07H QB6 MOK3 09H QB6 MOB 12H QB6 MOA1 12H QB4 MOA2 12H QB6...
Страница 26: ...24 MOK 05CP QD0 MOK8 09C QB6 MOK9 09C QB6 MOB1 09C QC0 MOB1 09C QC4 MOB2 12C QC4 MOF 18C QC2 MOF2 18C QC4...
Страница 27: ...25 MOB3 18C QB8 MOC2 18C QC0 MOB1 18CP QC0 MOB2 18CP QC0...
Страница 28: ...26 MOB 18H QB6...
Страница 29: ...27 MOF 18C QC4W MOF4 21H QB6W...
Страница 30: ...28 MOF 22C QC0 MOF 22C QB8 MOF 24H QB4...