
维修手册
Service Manual
, 2017 v1.0
7
/
11
3.2
安装底座
Mounting base
安装图示
3
颗螺钉,紧固底盖
Install 3 screws and tighten the bottom cover.
3.3
同步电机安装
Synchronous motor installation
紧固图示三颗螺钉,将同步电机固定在摇头
支架及底座上
Tighten three screws and fix the synchronous
motor on the shaking head bracket and the base.
3.4
风机组件、
PTC
发热体、前网及出风口安装
Fan assembly, PTC heater, front
network and outlet installation.