INSTALLATION AND OPERATION MANUAL, GAS FIRED STEAMER, MODELS GCX-2, GCX-10
PART NUMBER 10056R3
15
2009-03-24
4.0 OPERATION INSTRUCTION FOR BOILERS WITH CSD-1 CONTROLS
(Continued)
Daily Startup Procedure
1.
Close the manual blowdown valve, if so equipped.
2.
Examine that the pilot burner flame is burning. If the pilot burner is out, a five (5) minute
period of complete gas supply shut off is required before relighting.
3.
Open cabinet door and turn “ON” the power switch.
The green pilot light will come “ON”. Water will begin to enter the boiler. When enough
water has entered the boiler the (amber) “STANDBY” pilot light will come on.
4.
Press the “RESET” switch to begin the boiler operation. The “STANDBY” pilot light will go
off and the boiler will begin operation.
Daily Shutdown Procedure
1.
Turn “OFF” the power switch. Observe that the burners go off.
2.
Open the manual blowdown valve, if so equipped. If the appliance is equipped with an
automatic blowdown solenoid valve, the boiler’s contents, water and steam will be blown
out and exhausted through the appliance drain. The cold water solenoid valve will be
activated.
Complete Shutdown Procedure
If the appliance is not intended to be operational for a lengthy period, then shut it down
completely.
1.
Open the manual blowdown valve, if so equipped.
2.
Shut off all supplies of power, gas and water to the appliance.
Normal Boiler Operating Cycle
Water Fill Cycle
On the initial filling of the boiler, the reset switch must be activated to initialize the safety lockout
circuit. Once the water in the boiler has reached the proper level, the level control will open the
circuit to the fill solenoid valve, stopping the flow of water to the boiler. As the water is
consumed in the production of steam, the level control will close the circuit to the fill solenoid
and water will be supplied to the boiler.