background image

 Page 3

PARTS CONTINUED

HARDWARE KIT (PART # 91-00177)

HP-6MM (6MM RACK SCREWS)

TOP / BOTTOM BOLT

QTY 

H

PART 

SIDE BRACKET SCREW

QTY 

25

PART 

G

QTY 

100

CN6MM-100 (6MM CAGE NUTS)

FOR EQUIPMENT

 INSTALLATION

QTY 

100

FOR EQUIPMENT

 INSTALLATION

ADDITIONAL RAIL HARDWARE KIT 

(PART # ARRHK)

Z-RAIL ADAPTOR

QTY 

4

PART 

1/4-20 BOLT

QTY 

K

J

PART 

16

 OVAL NUT

QTY 

L

PART 

16

SQUARING PANEL

QTY 

2

PART 

  N

CAGE NUT RACKRAIL

QTY 

4

PART 

Z-RAIL ADAPTER/CAGE NUT RACKRAIL PARTS

M

12

Содержание R4CN Series

Страница 1: ...g this product PRODUCT FEATURES Four post design provides unrestricted heat flow and access to equipment Four point mounting for deeper heavier components Use with optional VCD Series Vertical Cable Duct for clean reliable cable management Cage nut rackrail ideal for mounting most servers Optional Side Panels and Additional Rail Kits available WEIGHT RATING 800 lbs UL listed load capacity UL R C U...

Страница 2: ...Page 2 PARTS CHANNEL QTY 4 A PART TOP BRACKET QTY 2 B PART CENTER BRACKET QTY 2 C PART BOTTOM BRACKET QTY 2 D PART BASE QTY 2 E PART FRONT BRACKET QTY 2 F PART 2 Left Channels 2 Right Channels ...

Страница 3: ...Y 25 PART G QTY 100 CN6MM 100 6MM CAGE NUTS FOR EQUIPMENT INSTALLATION QTY 100 FOR EQUIPMENT INSTALLATION ADDITIONAL RAIL HARDWARE KIT PART ARRHK Z RAIL ADAPTOR QTY 4 PART 1 4 20 BOLT QTY K J PART 16 OVAL NUT QTY L PART 16 SQUARING PANEL QTY 2 PART N CAGE NUT RACKRAIL QTY 4 PART Z RAIL ADAPTER CAGE NUT RACKRAIL PARTS M 12 ...

Страница 4: ... FIGURE E 4 Repeat steps 1 3 to install a second Channel A 5 Fully tighten screws in all locations 6 Repeat steps 1 5 for the second side assembly NOTES Bottom of Channels indicated by two mounting holes Top of Channels indicated by one mounting hole FIGURE A When installing brackets see FIGURE B for teardrop orientation Tools Required For These Steps 2 Phillips Driver FIGURE E FIGURE A SEE FIGURE...

Страница 5: ...and Bases E with supplied hardware H as shown Loosely tighten hardware SEE FIGURE F SEE FIGURE G 2 Stand rack upright square the assembly by installing the squaring panels N with supplied 6MM cage nuts and rack screws as shown Fully tighten all hardware FIGURE H F E FIGURE F FIGURE H Tools Required In This Step 9 16 Wrench H H FIGURE G N N ...

Страница 6: ...as shown Loosely tighten hardware ASSEMBLY TOP AND BOTTOM FACING INWARD SEE FIGURE J SEE FIGURE K FIGURE L FIGURE K FIGURE J F H H A E 2 Stand rack upright square the assembly by installing the squaring panels N with supplied 6MM cage nuts and rack screws as shown Fully tighten all hardware FIGURE L Tools Required In This Step 9 16 Wrench N N ...

Страница 7: ...ths Tools Required 7 16 wrench 1 Install Z Rail Adaptor as shown in desired locations SEE FIGURE M M M NOTE Cage Nut Rackrail for 45 space rack comes in two sizes Pair like sizes accordingly TIP Depending on mounting needs Cage Nut Rackrail can be mounted at different depths CAGE NUT RAIL INSTALLATION Tools Required 7 16 wrench 1 Install Cage Nut Rail as shown in desired locations FIGURE N SEE FIG...

Страница 8: ...F ANY KIND EITHER EXPRESSED OR IMPLIED INCLUDING BUT NOT LIMITED TO IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE TO THE MAXIMUM EXTENT PERMITTED BY APPLICABLE LAW IN NO EVENT SHALL THE COMPANY BE LIABLE FOR ANY SPECIAL INCIDENTAL INDIRECT OR CONSEQUENTIAL DAMAGES WHATSOEVER INCLUDING WITHOUT LIMITATION DAMAGES FOR LOSS OF BUSINESS PROFITS BUSINESS INTERRUPTION OR ANY ...

Отзывы: