Quick Start Guide 3
miriac SBC-LS1028A User Manual
V 1.0
11/65
© MicroSys Electronics GmbH 2019
3.2
Board Preparation and Power-Up
■
Make sure the switches SW1 and SW2 are set properly in order to select the
correct boot source and board configuration (refer to chapter 7.1).
■
The board comes preconfigured to boot correctly on arrival.
■
Connect the mini USB cable to ST14.
■
Connect other peripherals (USB, LAN, mSATA, ...) as needed.
■
Connect the power supply to the ST20 connector, while the power supply is
still switched off.
■
Switch on the power.
Figure 3-1 System setup example
Power supply
USB cable (serial console)
Ethernet cable