5
17
SGND
Signal grounding wire
18
SIG2
Electrode wire
Shielding network
DS2
19
220V
220V AC power supply access
20
220V
21
PE
22
24V
24V DC power supply access
23
24V
4
Start up
4.1
Switch on
Before turning on the power, please check that the system has been properly installed as required,
including:
a) The instrument shall be mechanically safe and shall be installed in accordance with regulations;
b) The power supply shall be connected according to regulations;
c) The electrical connection wire of the cavity shall be protected, and the cap shall be tightened;
d) Please check whether the running data of the power supply is correct.
4.2
Converter start-up
The measuring instrument is composed of a sensor and a converter and is ready for immediate use
when it is supplied. All operating data is factory set according to your order, please refer to the provided
inspection report for details.
After turning on the power, the flowmeter performs a self-check first. After the self-check, the flow meter
directly starts flow measurement and displays the current measured value.
Figure 3 Main interface of flow meter
The detailed information of the flowmeter interface status after startup is shown in Table 4.
Table 4
Display
Description
Reuse content
①
Real-time flow value and unit
Null
②
Inlet and outlet temperature
values
The display can be switched through the down key: flow
percentage, resistance value, temperature difference, flow rate
③
Alarm mark
System alarm, you can check the alarm content by up key
④
Accumulated of heat quantity
Accumulated heat, accumulated flow, and view specific alarm
content through the up key
④
③
①
②
Содержание MFE600H Series
Страница 1: ...MFE600H Operation Manual V2 1...
Страница 30: ...www microsensorcorp com...