![MicroNet SP698A Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/micronet/sp698a/sp698a_user-manual_1787975005.webp)
4
2. Installation
2.1 Preparing the Site
Select the site that meets the following requirements:
Characteristic
Requirement
Temperature
32 to 122˚F (0 to 50˚C)
Humidity
10% ~ 90%, non-condensing
2.2 Settling the Switch
Mounted to 19-inch standard rack
Locate the accessories provided in the product package. Use the rack-mount brackets and
screws to install the switch into any EIA 19” standard rack.
Step 1: Attach the brackets to each side of the chassis.
Step 2: Apply the screws to each side and secure them tightly.
Step 3: Carefully position the switch into the rack.
Step 4: Align the brackets to the side holes on the rack and use rack screws to secure the
chassis with the rack.
Desktop or any flat surface
The switch can sit on desktop or any flat surface with adequate space and ventilation. If
you want to place it onto a shelf, make sure the shelf can withstand the weight of the
switch.
Step 1: Simply put the switch on the desired place.
Step 2: Ensure the switch receives good ventilation.
Step 3: Proceed to the “Connecting to Power” section.
2.3 Connecting to Power
Locate the provided AC power cord.
Step 1: Connect the AC power cord to the receptacle at the back of the switch.
Step 2: Attach the plug into a standard AC outlet with a voltage ranging from 100 to 240
VAC.
Step 3: The power LED on the front panel will come on then.
2.4 Connecting to Network
Step 1: First, ensure the power of the switch (and end devices) is turned off.
L
It may cause electric shock or any possible harm to you if the power is not switched off.
Step 2: Prepare cable with corresponding connectors for each type of port in use.