IM30-B00
Doc. N°
MO-0132-ING
Copyright 2010 - Microener
Firmware
2.0X
Data
22.04.2008
Rev.
2
Pag
23
of
23
24.
Setting’s Form
Relay Type
IM30-B00
Station :
Circuit :
Date :
/
/
FW Version:
Relay Serial Number :
Power Supply
24V(-20%) / 110V(+15%) a.c.
24V(-20%) / 125V(+20%) d.c.
Rated Current :
1A
5A
80V(-20%) / 220V(+15%) a.c.
90V(-20%) / 250V(+20%) d.c.
RELAY PROGRAMMING
Variable
Description
Setting
Range
Default
Setting
Actual
Setting
Test Result
Pick-up Reset
xxxxxxx
Current date
DDMMMYY
-
Random
xx:xx:xx
Current time
HH:MM:SS
-
Random
Fn
Mains frequency
50 - 60
Hz
50
HI
Rated primary current of the C.T. supplying terminals
29-28(30)
1 - 9999
Ap
500
LI
Rated primary current of the C.T. supplying terminals
32-31(33)
1 - 9999
Ap
500
F(1I)
Operation characteristic of the first earth fault
element
D A B C
MI SI VI I EI
-
D
1I
Trip level of first earth fault element
0.01 - 2 - Dis
LI
1.0
t1I
Trip time delay of first earth fault element.
0.05 - 30
s
0.05
2I
Trip level of second earth fault element
0.01 - 2 - Dis
LI
1.0
t2I
Trip time delay of the second earth fault element
0.05 - 3
s
0.05
3I
Trip level of third earth fault element 0.5
– 10 - Dis
HI
0.1
t3I
Trip time delay of the third earth fault element
0.02 - 3
s
0.02
tBF
Time delay for Breaker Failure alarm
0.05 - 0.75
s
0.05
Tsyn
Synchronisation Time
Expected time interval between sync. pulses.
5 - 60 - Dis
m
Dis
NodAd
Identification number for connection on serial
communication bus
1 - 250
-
1
CONFIGURATION OF OUTPUT RELAYS
Default Setting
Actual Setting
Protect.
Element
Output
Relays
Description
Protect.
Element
Output
Relays
1I
1
-
-
-
Instantaneous element of first earth fault element
1F50N
1I
t1I
-
-
-
-
As above, time delayed element.
1F51N
t1I
2I
1
-
-
-
Instantaneous element of second earth fault element
2F50N
2I
t2I
-
-
-
-
As above, time delayed element.
2F51N
t2I
3I
-
-
-
-
Instantaneous of the third earth fault element
3F50N
3I
t3I
-
2
-
-
As above, time delayed element.
3F51N
t3I
tBF
-
-
-
4 Breaker failure alarm
tBF
tFRes
:
A
The reset after tripping of the relays associated to the time
delayed elements can take place:
(A)
automatically
(M)
manually
tFRes
:
B2
1I,2I
The input (B2) for blocking the operation of the time delayed
elements relevant to input terminals LI
B2
B3
3I
The input (B3) for blocking the operation of the time delayed
elements relevant to input terminals HI
B3
tB2
2tBF
The blocking of the elements 1I, 2I
tB2
tB3
2tBF
As above, for the earth fault elements
tB3
Commissioning Engineer :
Date :
Customer Witness :
Date :