6.4 PROCEDURE TO INSTALL THE DRAFT TOWERS AND AIR SUPPLY
HOSE (ONLY “DD” MODELS)
Models: MDD17-E, MDD23-E, MDD58-E, MDD68-E, MDD78-E and MDD94-E
This procedure describes how to install the air channel needed to provide cold air directly into the
beer towers.
Tools needed: Philips screwdriver
STEP 1 Locate the gaskets and bolts included in with your Tower. Place gasket over the pre-drilled
holes and place the 4 screws thru the tower base. Align the tower with screws and gasket
to the cabinet top as shown below while dropping the beer line(s) thru the top of the unit
(Figure #1).
STEP 2 Tighten the screws using the nuts found in your tower box (Figure #2).
STEP 3 Identify the “COLD AIR HOSE” (Figure #3) which is found inside of the equipment.
STEP 4 Introduce the “COLD AIR HOSE” (Figure #4) which is found inside of the equipment into the
tower’s base hole. Push the cold air hose as far as possible up into the tower body. Be sure
and secure cold air hose by hooking on to beer hose elbow.
6.5 GLASS RINSER WATER INLET INSTALLATION
• Always check local plumbing codes first.
• Install in-line water regulator (#1750352C) set at 15 PSI from the street water supply (no greater,
perfect operating pressure).
• Install in-line one way check valve from the street water supply (prevents pressure drop which
can cause leaking).
NOTE: It is recommended a licensed plumber connect the glass rinser to the water supply line.
Always use an in-line shut-off and water pressure regulator. Micro Matic shall not be held liable
for damage caused by improper installation.
| 13
MICROMATIC.COM
SUPPORT (888) 864-9400
IN-LINE WATER PRESSURE
REGULATOR
#1750352C