Page 11
Initial Operation
IMS5x00
Initial Operation
i
Initializing starts after the voltage supply has been
switched on. The measuring system is ready for
use after approx. 10 seconds. To ensure precise
measurements, let the measuring system warm up
for approx. 60 minutes.
The controller is factory set to the static IP address
169.254.168.150. Use this address for a direct connec-
tion with a browser.
The start screen of the controller software is displayed in
the web browser now.
You can check the IP address of the controller, that are
connected to a PC / network, with the sensorTOOL.
exe program. This program is available online at
www.micro-epsilon.de/download/software/sensorTOOL.
exe
.
Start the program sensorTOOL and click the button
.
Click the
Open WebPage button
to connect the
controller to your default browser.
Select a Sensor
Change to the
Settings
>
Sensor
menu.
Select a sensor from
the list.
Start of Measuring Range, Working Distance
A base distance (SMR) or working distance must be main-
tained for each sensor.
Distance sensor
SMR
Thickness sensor
Working distance
Operating range
MR
Measurement
object