Page 53
Operation
English
capaNCDT 6100
Electronics, Ground Connection, Earthing
4.6
The sensor housings are connected to signal ground and to supply ground by capacitors.
Signal ground and supply ground are dc-insulated for the 24 V option.
Mounting the sensor in a metal holder establishes a sufficient ground connection.
An additional groundconnection is required for small, remotely located targets. Connect the target to the
sensor housing for this.
Operation
5.
Starting Up
5.1
Connect the display/output devices through the signal output socket, see Chap.
, before connecting
the device to the power supply and switching on the power supply.
i
Allow the measuring system to warm up for about one minute before the first measurement or calibrati-
on.
Basic Settings
5.2
The gain and zero point of the measuring channel are adjusted with the ’gain’ and ’zero’ trimmer potentiome-
ters, see
, (setting range approx. 20 turns per potentiometer).
The end settings at the left and right stops are recogniceable by a slight click.
Содержание capaNCDT 6100
Страница 32: ......
Страница 34: ...capaNCDT 6100 6 Maintenance 59 7 Warranty 60 8 Decommissioning Disposal 60 9 Appendix 61...