background image

cable can be disconnected from the air conditioner and easily removed through the floor.
The cannon plug

cannot

be removed as the plug socket flange is positioned on top of the

floor in order to be certain the plug connector will fully engage to the opposing floor
socket connector.

Thus, once the cannon plug is installed, the floor can only be removed

for inspections or maintenance to the extent of extra primary wire length you allow.

The Skybolt kit includes a heavy-duty military Amphenol cannon connector (AC-2100
Set). It is a two-connecter plug with solder in each connector for field installation of the
wire. The toughest trick is to map out the assembly sequence of all the components in the
plug set. Be especially careful that you feed the wire through the various components
prior to soldering the wire.

The AC-2100 socket has 4 mounting screws to be
attached to the rear baggage compartment floor.

Before installing the plug, complete step 3 –
Preparation of the Baggage Compartment Floor).

Once the plug is installed, the floor is basically
attached to the airframe to the limit of the extra length
wire allowed in your installation. If you tackled the
primary wire as the first step in installation, before
drilling the connecter hole and the controller cable
hole and soldering the socket side of the plug,
proceed to the next steps first as you must remove the
floor to locate the wiring holes, the condensate drain
holes, and the tie-down track.

Step 2: Condenser Air Exhaust –

To keep this installation as simple as
possible and maintain the portable nature of
the Artic Air unit, the condenser air is
ducted directly into the aft fuselage to be
discharged in the aft tail section. Thus,
depending on the unit (one or two ducts)
holes in the aft bulkhead must be cut. When
the unit is installed, the duct(s) are
positioned through bulkhead hole(s).

One of the first steps in the installation is to
set the Artic unit in the baggage
compartment and locate the condenser duct

Содержание Artic Air 24

Страница 1: ...AC 2109 to be installed with the circuit breaker For the Beech Baron the easiest routing is along the right side of the fuselage and cabin to the aft baggage area This routing requires the least amount of side panels or floor removal When routing the primary wire also plan to route the controller cable The controller cable is shielded and should not be cut or spliced We recommend a longer control ...

Страница 2: ...ggage compartment floor Before installing the plug complete step 3 Preparation of the Baggage Compartment Floor Once the plug is installed the floor is basically attached to the airframe to the limit of the extra length wire allowed in your installation If you tackled the primary wire as the first step in installation before drilling the connecter hole and the controller cable hole and soldering t...

Страница 3: ...arance of the protective lip and in the center Now determine the location for both tie down tracks Plan on approximately 1 clearance from the edge of the track to the side of the floor in order to have access to the floor hold down screws Run the track parallel to the cabin wall floor edge This will maximize the clearance for the tie down ratchets AC 2128 Before committing to the exact location of...

Страница 4: ...fitting such that the drain mast chamfer is facing aft We use an Oring on the outer surface and use LocTite Red to secure the fitting nut Before you attach the hose from the belly fitting to the floor fitting solder and install the cannon plug Step 5 Final Installation of Cannon Plug Route the primary wire through the floor Properly assemble the plug socket components including the heat shrink ont...

Страница 5: ...fety wire the vinyl hose end to the fitting Note For air conditional removal simply loosen and disconnect the fitting Step 8 Controller Location and Installation This step will be unique to every aircraft based on panel availability The key is to have plenty of controller cable length We recommend at least 20 35 feet maximum feet as any shorter length may restrict your options Step 9 Ground Use On...

Страница 6: ......

Страница 7: ......

Страница 8: ......

Страница 9: ......

Страница 10: ......

Страница 11: ......

Страница 12: ......

Страница 13: ......

Страница 14: ......

Страница 15: ......

Страница 16: ......

Страница 17: ......

Страница 18: ......

Страница 19: ......

Страница 20: ......

Страница 21: ......

Страница 22: ......

Страница 23: ......

Отзывы: