Mi-T-M
Undercarriage Wash System Operator's Manual
13
IF "NO" WAS MARKED TO ANY OF THESE QUESTIONS, CORRECT THE SITUATION BEFORE OPERATING.
PRE-OPERATION CHECKLIST
STOP
TO ENSURE YOUR UNDERCARRIAGE WASH SYSTEM OPERATES SAFELY AND
EFFICIENTLY, COMPLETE THE PRE-OPERATION CHECKLIST BEFORE PROCEEDING.
Before proceeding, answer all the questions on this checklist.
YES
NO
CODES:
1. Does the electrical wiring meet all codes?
2. Does plumbing meet all codes?
LOCATION:
1. Is the unit located on a hard level surface?
2. Is the unit located in a large ventilated area?
3. Is the spray bar securely anchored and lined up underneath the cover?
4. Does the cover have enough clearance over spray bar to avoid deflecting into spray bar when
vehicles drive over?
5. Is cover lined up over spray bar with nozzles centered in slots?
6. Is the photo-eye and selector switch remote box located in the proper location?
ELECTRICAL:
1. Is the unit properly grounded?
2. Does the power supply, voltage and amperage match the data plate?
3. Are the control floats and remote switch(es) properly installed?
4. Is the selector switch remote box wired in correctly?
PLUMBING:
1. Is the plumbing sized correctly?
2. Have all connections been tightened and been made properly.
3. Are all unions tightened?
GENERAL:
1. Have all operators using this unit read and understood this entire manual?
2. Has the unit been installed by qualified service people who followed the instructions listed in
this manual?