ALPHA 700

8.0 air supply

& ventilation

An adequate supply of fresh air for combustion and ventilation of the boiler house must be supplied in

accordance with BS6644/BS5410 as appropriate.

The air supply should be achieved using:

a) Natural ventilation with low level and high level openings.

b) Using a fan to supply air to a low level opening with natural discharge through a high level opening.

c) Using a fan to supply air to a low level opening and a fan to extract air at a high level opening.

Where natural ventilation is used, suitable permanent openings connected directly to the outside air must
be provided. The openings should be fitted with grilles that cannot be easily blocked or flooded. The free
area of the grilles should be as follows:-

LOW LEVEL (inlet)

540cm

2

plus 4.5cm

2

per kW in excess of 60kW of total rated input.

HIGH LEVEL (outlet)

270cm

2

plus 2.25cm

2

per kW in excess of 60kW of total rated input.

10.0 clearances 

The dimensions shown below are required for proper access for assembly and maintenance. There is

no requirement for clearance above the boiler.

Alpha boilers should be installed on a level

fireproof plinth with a minimum height of 100mm.
The plinth must be capable of supporting the
weight of the boiler/s when they are filled with
water. The front of the plinth can be level with, but
not extend beyond, the front of the boiler casing.
Depending on the make of burner selected, dual
fuel applications may require a higher plinth.
Details will be provided on request.

plinth details

B

A

10cms

Plinth must be level and trowelled smooth.

300

136

112

340

150

112

380

163

112

425

177

112

470

190

112

510

204

112

555

217

112

600

231

112

640

244

112

Alpha 700 

A cm

B cm

Model

300

340

380

425

470

510

555

600

640

Gas

580

580

580

580

580

580

840

840

840

Oil

470

470

470

470

470

470

680

680

680

Dual Fuel

610

610

770

770

770

770

920

920

920

Dimension X in mm

1000 min

1000

X

450 min

X + 200

(450 min)

9.0 boiler base

Содержание ALPHA700 300

Страница 1: ...T I O N A L O I L G A S D U A L F U E L B O I L E R S S I N G L E U N I T O U T P U T S 2 9 5 k W 6 4 0 k W I N S T R U C T I O N S F O R A S S E M B LY I N S T A L L A T I O N S E R V I C I N G O P...

Страница 2: ...Schematic Using Diverter Valves 10 14 0 Minimum Water Flow Rate 15 0 Circulating Water 16 0 Flue Systems 11 17 0 Control Panel 12 17 0 Standard Boiler Control Panel Electrical Diagram 13 17 18 0 Boil...

Страница 3: ...of the installation If the Alpha 700 boiler is to be gas fired then the installer must be deemed to be competent in the relevant areas of gas work involved and be Corgi Registered for those areas 2 0...

Страница 4: ...volume and this coupled with the principle of flue gas flow employed and power flame combustion significantly reduces un burnt particles and harmful oxides protecting the environment from higher leve...

Страница 5: ...he door is hinged on both left and right hand sides giving freedom of choice for handed opening without the need to move hinge positions The door is heavily insulated with dense ceramic fibre panels w...

Страница 6: ...team supply purposes BS 6644 1991 Specification for installation of gas fired hot water boilers of rated inputs between 60kW and 2MW IGE UP 2 Gas Installation pipework boosters and compressors on indu...

Страница 7: ...m2 per kW in excess of 60kW of total rated input 10 0 clearances The dimensions shown below are required for proper access for assembly and maintenance There is no requirement for clearance above the...

Страница 8: ...5 614 3 2095 9 452 99 4 13 1 8 78 6 58 420 210 105 6 58 95 5 5 79 75 63 73 14 01 868 1 30 658 225 62 91 2221 7 811 3 28 651 210 20 0 8 0 0 3 0 0 0 12 DN100 300 11 81 2405 2857 15 14 600 596 5 2035 2 6...

Страница 9: ...stant Temp Circuit Primary Circulating Pump 3 Way Vent Valve Gate Valve Boiler No 1 No 2 No 3 Water Sensor Zone Controls Thermometer Open Vent Safety Valve Boiler Sequence Controller Zone 2 Zone 1 Mix...

Страница 10: ...er Due consideration must be given to the requirements of the Clean Air Act Memorandum on Chimney Heights 3rd Edition when designing flue systems and selecting terminal positions Detailed guidance and...

Страница 11: ...nd stage control thermostat H Water temperature thermometer B 1st stage control thermostat I Overheat trip lamp C High limit thermostat reset button J 1st stage hours run counter D Pump control switch...

Страница 12: ...w BK Black V Violet G Green B Blue W White BW Brown Y G Y ellow Green Blue wire N Neutral Y ellow Green Earth RemovelinkD Gandinstallvoltfreecontacttoachieve remoteexternalon offcontrol Removelinkx ya...

Страница 13: ...iler on 2Nr flat strips of steel min 100mm wide this will allow the section to move more easily into the final mounted position see fig 1 18 2 2 Insert woven glass fibre sealing rope into deep groove...

Страница 14: ...e sections one to another but do not over tighten The purpose of the tie rods is to hold the boiler body in an assembled manner and not to add compression 18 2 8 Check position of boiler body and if n...

Страница 15: ...and retain the vertical beams d Fit and tighten firmly but do not over tighten securing nuts onto target wall fixing studs e Carefully place into position the secondary mill board panel not shown f E...

Страница 16: ...te Only fitted to boilers 425 640 See fig 10 7 Fit casing rear side panels onto horizontal profiles and fasten onto rear section by using M10 x 12 17 Fasten bottom of casing to bottom profile using se...

Страница 17: ...17 ALPHA700 fig 7 fig 9 fig 8 3 1 3 6 7 7 257mm 224mm 6 9 3 1 2 1 6 3 8 4 4 6 5 5 Top Bottom Casing support strut vertical fig 10 21 20 22 11 15 16 17 17 16 15 10 14 19 18 12 13 23...

Страница 18: ...mplete with bolts and gaskets When making the flow connection ensure flow connection spool piece complete with thermostat pockets is attached directly to the boiler using gasket and fixings provided a...

Страница 19: ...tible for use with the following ancillary controls 1 Time Clock Programmer 4 Sequence Control Panel 2 Room Thermostat 5 Compensating Equipment 3 Frost Protection Thermostat 6 Optimum Start Stop Equip...

Страница 20: ...iciency checks and make any trimming adjustments of the burner manufacturers instructions Ensure that all checks and adjustments are made after burner has been operating for at least 5 minutes d When...

Страница 21: ...ceramic back protection target wall and replace if deteriorated e Thoroughly brush through all flueways and combustion chamber Use a vacuum cleaner to assist Take care not to damage ceramic back prote...

Страница 22: ...0 0 0 0 h l O l O C 20 40 60 A 2nd stage control thermostat H Water temperature thermometer B 1st stage control thermostat I Overheat trip lamp C High limit thermostat reset button J 1st stage hours...

Страница 23: ...d and circulating pumps and reset boiler non operational limit thermostat Control thermostats Replace thermostats defective out of and reset limit calibration thermostat Limit thermostat Replace limit...

Страница 24: ...em fuel service cock installed System fuel service cock accessible Fuel pipework clean sound purged Fuel available at boiler Electrical supply fused isolated earthed Local isolation available External...

Страница 25: ...ture Water return temperature Head setting Damper setting Nozzle make Nozzle angle Nozzle capacity Gas inlet pressure switch setting Control stat operation checked set to Hi Low stat operation checked...

Страница 26: ...o Boiler Serial No Burner Serial No 30 0 service repair record sheet C0 Flue draught Gas Inlet Pressure all boilers firing Date work carried out Order No Hours run on meter reading Work carried out Re...

Страница 27: ...080 7 Burner Plate 213082 8 Smoke Hood 214316 9 Bracket Back Refractory Brick 236313 10 Back Plate Insulation 250495 11 Back Refactory Brick 251765 12 Boiler Brush Alpha 700 300 640 470309 13 Sight Gl...

Страница 28: ...nd specifications are not binding in detail All offers and sales are subject to the Company s current terms and conditions of sale 35 Nobel Square Burnt Mills Industrial Estate Basildon Essex SS13 1LT...

Отзывы: