51033211EN/AC
2. Installation
This type of connection must be carried out by qualified electrical personnel.
Before carrying out any connections, check that the battery circuit breaker is OFF
and that the upstream protection devices (AC distribution system) are open (OFF).
The overall cable diameter and the cross-sectional area
of the three wires depends on the
UPS
rating.
Power and equipment connections:
1. Remove the terminal-block cover .
2. Insert the cable supplying the equipment and the power
cable through the cable clamps .
3. Connect the three wires of the equipment cable to the output
terminal block .
Always connect the earthing wire first.
4. Connect the three wires of the power cable to the input
terminal block .
5. Refit the terminal-block cover.
6. Tighten the nut on the cable clamp .
8
32
33
5
33
4
Install
8
Earthing wires
32
33
4
5
Output terminal block
Input terminal block
Cable diameter
Cross-sectional area of each wire
Pulsar EX
treme
2000
Pulsar EX
treme
3000
From 9 to 12 mm
From 9 to 12 mm
1 to 4 mm
2
1,5 to 4 mm
2
Recommended upstream
circuit breaker
◗
Nominal rating
(47 to 63Hz, 230V)
◗
Maximum rating
(47 to 63Hz, 187V)
C60N 10A 2P
(maximum line
current = 9A)
C60N 16A 2P
(maximum line
current = 11A)
C60N 16A 2P
(maximum line
current = 13A)
C60N 20A 2P
(maximum line
current = 16A)