MG WHM-2020 Скачать руководство пользователя страница 8

 

MG WELDING                                                                                          WHM-2020                                                                    

  

 

 
3.      Basic Construction 

 

3.1     Hoisting Assembly 

 

 

This  is  a  lifting  system,  which  moves  the  entire  Mast  Plate  Assembly,  the 

Boom,  Welding  Head  and  all  ancillary  fixtures  that  is  mounted  therein,  up 
and down the column. 

 

 

The lifting force is effected via a geared motor c/w brake on a chain. 

 
3.2     Mast Plate 

 

 

The Mast Plate or commonly refer as the Saddle, is fitted with guide rollers 

for the boom and guides the column. 

 

 

The front face guide rollers engaged onto the Boom, thus allowing the Boom 
to traverse left or right. 

  

 

The rear face guides engaged onto the guide Rail of the Mast, thus allowing 

the Mast Plate to move up or down. 

 

3.3     Column or Mast 
 

 

The Column is constructed in a box-up design and the rails are machined in a 
single pass to ensure a tight tolerance. 

 

 

The column is bolted down onto a Slew Ring, the latter being mounted on a 
Fixed Base or a Travel Car. 

 

 

locking screws.  

 
3.4     Boom 

 

 

This is tabular in construction and offer both rigidity and  torsion, thereby 

minimizing deflection during operation. 

 

 

The guide rails are precision-machined in a single stroke. 

 

7

 

Содержание WHM-2020

Страница 1: ...M MA AN NI IP PU UL LA AT TO OR R W WH HM M 2 20 02 20 0 O OP PE ER RA AT TI IO ON N M MA AI IN NT TE EN NA AN NC CE E M MA AN NU UA AL L W WH HM M 2 20 02 20 0...

Страница 2: ...2 Installation Preparation 4 OPERATION AND MAINTENANCE ______________________________ 5 1 General Description 5 2 Main Specification 6 3 Basic Construction 7 4 Installation 9 5 Pre Operation Inspecti...

Страница 3: ...0Hz with brake Brake Supply 220V Boom Speed 290to2940mm min 0 37kw at 6 60Hz with Farce Cooling Power Supply 400V 3P 50HZ Control Voltage 24V AC Slewing Feature Yes Max Under Boom Height 2000mm Effect...

Страница 4: ...ment protection These compulsory regulations may also deal with handling of hazardous substances issuing and or warning of personal protective equipment or traffic regulations 1 4 Installation instruc...

Страница 5: ...2 4 MG WELDING Manipulator is designed for ready to use and there is no further mechanical installation requirement except to provide connection to the electrical supply However we recommended that a...

Страница 6: ...nvironment expected of such application Detail attentions such as grit blasting to SA 2 5 for all structural steel work and polyurethane paintwork will ensure that our equipment provides you with many...

Страница 7: ...to 3920mm min 6 Boom Drive Motor 0 37KW with Farce Cooling 7 Travel Speed N A 8 Max Under Boom Height 2000mm 9 Effective Boom Travel 2000mm 10 Electrical Panel Yes 11 Base Type Fixed 12 Column Rotatio...

Страница 8: ...ace guide rollers engaged onto the Boom thus allowing the Boom to traverse left or right The rear face guides engaged onto the guide Rail of the Mast thus allowing the Mast Plate to move up or down 3...

Страница 9: ...limit switches activated by striker block mounted on Mast Plate and Boom respectively 3 5 Travelcar This is of manual push type on V wheels 3 6 Electrical Panel This is mounted on the rear of column a...

Страница 10: ...be level and able to take the load of work piece without subsequent soil settlement Study the area of operation to ensure that it will be large enough for the work piece where extension will be requir...

Страница 11: ...phases of the supply Note Do not continue to operate the machine as the limit switch will not operate when phases are incorrect Test the Stop Button on the Pendant Controller to ensure its functionali...

Страница 12: ...No Task Results 1 Turn on the wall isolator Voltage is supplied to the main panel 2 Turn on isolator main switch on main electrical panel Power is turned on 3 Turn the Potentiometer to Low and test t...

Страница 13: ...s in good contact The operation of the manipulator is limited to the functions of the pendant General safety requirement needs to be observed as with all moving equipment Always warn fellow workers be...

Страница 14: ...STOP button Equipment stops operation 2 Depress Emergency STOP button on electrical panel No Power to Main Contactor 3 Turn off main switch on the electrical panel Power is turned off the Breaker 4 T...

Страница 15: ...n 3 months Bolt Fastener Visual on corrosion missing Weekly Warning Labels Visual replace where torn Weekly 8 3 All moving parts for example bearings and couplings are to be lubricated at regular inte...

Страница 16: ...ction Familiarize with the obstruction along the path of the Boom Unusual noise or smell during operations 8 5 Troubleshooting of Mechanical Parts No Malfunction 1 No move or lights No Incoming Power...

Страница 17: ...EMENT The General Arrangement is a CAD module illustrating the general set up of the equipment The main specifications of the equipment are also listed in the GA The General Arrangement for the WHT 3...

Страница 18: ...this section to give the user a detailed graphical illustration of the electrical components and circuit diagrams associated with the equipment For more information regarding the electrical and electr...

Страница 19: ...led Parts List Drawings are not included in this manual However you may contact our sales department through the contact numbers listed at the back page of this manual to request for the detailed part...

Страница 20: ...C C...

Отзывы: