![MG Energy Systems MGEMD010001 Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/mg-energy-systems/mgemd010001/mgemd010001_manual_1782744020.webp)
MG Energy Systems B.V. | Foeke Sjoerdswei 3 | 8914 BH Leeuwarden | The Netherlands
+31 (0)58 750 89 47 | [email protected] | www.mgenergysystems.eu
Innovation
in energy storage
8
INSTALLATION
Read the installation instructions in this chapter before commencing installation activities.
WARNING:
Before continuing make sure the following instructions are met:
Before switching the device ON check whether the available voltage
source conforms to the configuration settings of the product as described
in the manual.
Ensure that the equipment is used under the correct operating conditions.
8.1
Installation procedures
Below a list of the basic installation procedures:
1.
Mounting procedure of the device.
2.
Electrical connection procedure of the device.
8.2
Mounting procedure
This procedure describes how to mount the Energy Monitor. Mounting is done in the following
steps:
1.
Make a cut-out in the panel were the Energy Monitor is to be mounted. The size of the cut-
out should be 96 mm width and 61.5 mm height. See MG Energy Systems website for Energy
Monitor panel mount cut-out.
Figure 6 - Panel cut-out in mm