![Meyer Lot Pro 41275 Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/meyer/lot-pro-41275/lot-pro-41275_assembly-and-installation-manual_1781676008.webp)
For snow plow light installation see separate instructions.
Orange wire on Harness (53) will attach to both orange wires of the “B” harness supplied
in the Light Module Kit. Reference Form 1-757
Route Cables “C” (Yellow) from module to Harness (53). Connect both “C” Harness
female ends to the male corresponding ends of the Harness (53).
Connect both male ends from the snow plow light to the female ends on the Plow Side
Harness (31).
Check snow plow light blinkers to make sure the wires have not been reversed.
Note: All electrical connections should have both ends coated with a dielectric
grease, Meyer Part No. 15632, prior to fi nal installation. This will ensure a good
connection and help in preventing corrosion.
L. Refer to Operation and Maintenance Manual for complete controller operation.
M. After all electrical connections have been made the drop speed of the plow may be
evaluated / adjusted. To adjust, loosen the hex nut and adjust in to slow the drop speed
and out to make it faster. After ideal drop speed it achieved, retighten the hex nut.
See below.
After cycling of the plow, recheck oil level.
E-72 Lower Adjustment (left side of hydraulic unit):
Loosen jam nut and turn knob clockwise to slow the drop of the plow and counter
clockwise to speed the drop of the plow. Tighten jam nut.
(7)
N. A s s e m b l e a d j u s t a b l e s t a c k i n g s t o p b o l t s t o l i f t f r a m e ( 1 2 ) u s i n g
5/8-11 x 3” bolts (61), lockwasher (24) and jamnuts (62). See below.
Note: Adjustment must be made after moldboard assembly is installed. Adjustment
bolts (61) should make contact with the a-frame before any part of the A-Frame/
Sector or moldboard come in contact with the lift arm and, or hydraulic unit while
raising the snowplow or stacking snow. Moldboard should be checked in all positions.