background image

 

X

4

MR

250 

 

MexAir RC 

 

10 

 

 

5.

 

Frame Assembly 

a.

 

Assemble the balance of the frame as you complete the final wiring of your 
electronics.  See the accompanying photos for airframe standoff placements.  Note 
that the upper standoff CF tubes are embedded into the main frame.  They insert 
into the upper side of the main frame body and rest on the lower skin surface.  Prior 
to insertion, check that the hole is clear of any obstruction.  When finally tightened, 
this creates a very rigid frame.  Temporary and partial frame assembly may be 
desired as you progress through assembly.   

 

 
CF Tube Standoff Configuration 
(Steps 5a through 5e Completed) 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 

b.

 

Final tightening of the frame standoffs is done after all soldered / permanent 
equipment is installed.  The camera plate must be inserted into the front upper and 
lower slots completely while the forward standoff fasteners are loosely fitted.  The 
camera plate should rest squarely on the main frame body and top plate surfaces.  

  

                

Camera Plate Configuration 

 
 
 
 
 
 
 
 

Содержание X4MR 250

Страница 1: ...Class Racing Quad airframe We specialize in the design and construction of the airframe Since the various electronic components and peripherals are widely available through many sources our focus is...

Страница 2: ...me comes configured to mount the supplied Power Distribution Board with the included PDB standoffs and predrilled main frame mounting holes This PDB mount allows for piggy back mounting of a 30 5mm co...

Страница 3: ...o metal screw contact surfaces especially motor mounting screws 4 Dry fit and test all electronics and FPV gear to the extent possible during the build so disassembly will not be required after you ha...

Страница 4: ...ary to start tightening it back it out slightly repeating this process until the fastener is threaded to the proper depth This creates a threaded hole that should hold firmly without any other aid For...

Страница 5: ...both the positive and negative wire ends at the main body hole the large elongated hole You can always trace the polarity later during the build if you forget to do it now If supplied with colored wir...

Страница 6: ...ile holding the standoff in place Take care not to over tighten the standoff and shear off the screw For added assurance to prevent the screw from ever backing off a small dab of RTV Silicone Seal can...

Страница 7: ...s Verify that there will be sufficient wire to reach your intended ESC solder pad locations or connector A minimum wire length of about 4 inches is necessary If not use the Surface Wire Option describ...

Страница 8: ...o the arm using small tie wraps ii If using this option you may also consider surface mounting your motor ESCs directly on the arm surface Again this will additionally increase drag and turbulence and...

Страница 9: ...r This will allow for soldering the motor wires later and THEN moving the heat shrink over the ESCs prior to final shrinking d TEMPORARILY place the ESCs onto the bottom plate so that the motor pads f...

Страница 10: ...ole is clear of any obstruction When finally tightened this creates a very rigid frame Temporary and partial frame assembly may be desired as you progress through assembly CF Tube Standoff Configurati...

Страница 11: ...piece If there is any noted slipping or twist verify that all standoff fasteners are properly tensioned f Landing Gear Installation Note Nylon landing gear can be cut to desired length i Embedded Mot...

Страница 12: ...pivot with moderate force Tighten loosen the arms as necessary so that they are firmly seated but can pivot with moderate force Do not over tighten to cause excessive dimpling of the laminate or poss...

Отзывы: