5-10
d.
Press
GO BACK (F2)
, then press
MORE (F1)
to advance
to Manual Test Setup Window 2.
10.
Protective Earth
a.
Press
Protective Earth (F7)
.
b.
Connect the test leads between EARTH and ENCL.
c.
Press
START (F1)
. QA-90 will time the measurement and
stop automatically. Take measurements at 0, 100, 500, 1000
and 2000 m
Ω
with a Metron calibrating unit. Note that the
test current is delivered by a transformer located on the right
side of the cabinet. In low mains voltage, this transformer
will not deliver the IEC/UL-recommended 10 A. If you are
doing repetitive testing and the transformer gets hot, it may
turn off for a while to prevent overheating. It is not rated to
deliver in excess of 25 A in short circuit condition. A trans-
former for 100-120 V mains is available from METRON.
d.
Press
GO BACK (F2)
to return to the previous display.
11.
Insulating Resistance
.
Insulation resistance measurements are
done in both the
Mains to Case
and
Applied Part to Case
mod-
es.
a.
Ensure the QA-90 is ON for at least 30 minutes.
b.
Press
Insulating Resistance (F6)
.
c.
Select
Mains To Case (F7)
.
d.
Connect a voltmeter or a digital multimeter, with an input
impedance of 10 M
Ω
, between ENCL. and the mains outlet
on the front panel. Press
START (F1)
.
e.
Measure the test voltage.
f.
Trim the test voltage to within 500 ± 1 V. Then, use a cali-
brated resistor to measure values in the range 1-200 M
Ω
.
IMPORTANT
ENSURE
THAT THE TEST LEADS ARE CALIBRATED
BEFORE
CONDUCTING THIS MEASUREMENT. METRON RECOMMENDS
THAT, WHEN CALIBRATING THE QA-90, TEST LEAD CALIBRA-
TION BE DONE AT LEAST TWICE.
Содержание QA-90
Страница 1: ...QA 90 User Service Manual QA 90 Electrical Safety Analyzer P N 11025 V 3 13...
Страница 14: ...2 4 This page intentionally left blank...
Страница 30: ...3 16 This page intentionally left blank...
Страница 35: ...4 5 Test according to IEC60601 1 F7 Test Type Rapid F6 Test Mode Manual F5 GO BACK START F1 F2 F3 F4...
Страница 40: ...4 10 MANUAL TEST SETUP F7 Mains Voltage F6 Current Consumption F5 MORE MAIN MENU F1 F2 F3 F4...
Страница 44: ...4 14 This page intentionally left blank...
Страница 51: ...5 7 MORE GO BACK MAIN MENU F1 F2 F3 F4...
Страница 60: ......
Страница 68: ...6 8 This page intentionally left blank...
Страница 86: ...A 18 This page intentionally left blank...
Страница 88: ...B 2 This page intentionally left blank...
Страница 90: ...B 4 Measuring Board Component Location Layer 1...
Страница 91: ...B 5 Measuring Board Component Location Layer 2...
Страница 92: ...B 6 Measuring System Schematic Diagram Part 1 Measuring Preparation...
Страница 93: ...B 7 Measuring System Schematic Diagram Part 2 High Voltage Interface...
Страница 94: ...B 8 Measuring System Schematic Diagram Part 3 High Voltage Logic...
Страница 97: ...B 11 Measuring System Schematic Diagram Part 6 Measurement Matrix...
Страница 98: ...B 12 Measuring System Schematic Diagram Part 7 Program Amplifier and Lowpass...
Страница 99: ...B 13 Measuring System Schematic Diagram Part 8 Relay Drivers...
Страница 100: ...B 14 Microprocessor Board Component Location...
Страница 102: ...B 16 Microprocessor System Schematic Diagram Part 1 QA 90...
Страница 103: ...B 17 Microprocessor System Schematic Diagram Part 2 Integrated Keypad...
Страница 104: ...B 18 Microprocessor System Schematic Diagram Part 3 CPU...
Страница 105: ...B 19 Microprocessor System Schematic Diagram Part 4 CPU...
Страница 106: ...B 20 Microprocessor System Schematic Diagram Part 5 Printer and Display Interface...
Страница 108: ...B 22 This page intentionally left blank...
Страница 110: ...C 2 This page intentionally left blank...
Страница 112: ...D 2...