■■■■■■■■■■■■■■■■■■■■■■
4 Installation
872 Extension Module IC Pump
■■■■■■■■
33
Deaerating the high pressure pump
The instrument must be connected to the PC and switched on to deaerate
the high pressure pump.
5
1
2
6
7
5
3
4
5
Figure 22
Deaerating the high pressure pump
1
Syringe 10 mL 6.2816.020
For aspirating the eluent.
2
Luer connector
On purging needle.
3
Purging needle 6.2816.040
4
Deaerating capillary
5
PEEK pressure screws, short
6.2744.070
6
Purge valve
7
Purge valve rotary knob
1 Connecting the purging needle
■
Push the end of the purging needle
over the end of the
deaerating capillary
on the purge valve.
2 Connecting the syringe
■
of the purging
.
3 Opening purge valve
■
½
rotation counterclock-
wise.