metrofires ECO Mega Smart Built-In Скачать руководство пользователя страница 3

3

Prepare an opening in the wall as illustrated in Diagram 1.

•  If the enclosure is constructed to the full height of the 

room and is fully open/vented into the ceiling cavity of 
the home, then the venting requirements as detailed in 
Diagram 2 of this page are not required.

•   If the ECO Mega Smart Built-In is built into an enclosure 

that is not open/vented to the ceiling cavity, the 
enclosure must be vented as illustrated in Diagram 2 
and specified in the grey panel below.

•   Insulation is not required under the ECO Mega Smart Built-

In, it may sit directly onto a timber or particle board floor.

Note: Raise the fire box to suit any floor protector height.

•   The distance from the front edge of the enclosure, 

including wall lining (directly behind the fascia) to the 
centre of the flue is 445mm as shown.

Note: If a brick front is to be built you need to allow for the 
thickness of the bricks.

Diagram 2

F

lue centreline

Vent(s)

445mm

670mm min

84

5m

m

81

8m

m

10

00

m

m

9mm Promina board or equivalent 

non-combustible material. Please note: fire rated 

gib board is not an acceptable material

915mm

 - 1000m

m

1200mm

81

8m

m

10

00

m

m

Diagram 1

Stage 2 – Preparing the wall opening/cavity

• The timber frame opening must be a minimum of 

845mm high and 915mm wide. A 1000mm x 1200mm 
sheet of 9mm promina board or equivalent non-
combustible material is required around the fascia 
with a maximum opening to fit around the ECO Mega 
Smart Built-In firebox of 818mm high and 1000mm 
wide as illustrated in Diagrams 1 & 2.

• Please note: Fire rated Gib board is not an 

acceptable material.

 

CAUTION!

 

Important Information

• An air vent or vents are required on the rear of the 

enclosure. The bottom edge of this vent/vents must 
be no more than 100mm above the floor and have a 
minimum surface area of 32000sq mm. I.E a vent of 
400mm x 80mm on the rear of the cavity.

• If the enclosure is through an external wall, suitable 

precautions will be necessary to prevent rodents 
and debris from entering or restricting the air vents. 
If grills are used ensure the minimum vent area is 
maintained through the grill itself.

 

CAUTION!

 

Important Information

9mm Promina board or equivalent 

non-combustible material. Please note: fire rated 

gib board is not an acceptable material

Содержание ECO Mega Smart Built-In

Страница 1: ...Where to install a Metro in your home 8 Getting to know your Metro 8 Operating your Metro 8 Cleaning and maintenance 9 10 Replacement parts 10 Troubleshooting 11 Metro warranty 12 ECO Mega Smart Built...

Страница 2: ...alled correctly We recommend a competent and suitably qualified NZHHA installer WARNING Important Information Mixing of appliance or flue system components from different sources or modifying the dime...

Страница 3: ...ial Please note fire rated gib board is not an acceptable material 915mm 1000mm 1200mm 818mm 1000mm Diagram 1 Stage 2 Preparing the wall opening cavity The timber frame opening must be a minimum of 84...

Страница 4: ...ning are equal Secure the ECO Mega Smart Built In to the floor through the two restraint holes provided in each corner at the front of the cabinet Masonry anchors are required for a concrete floor and...

Страница 5: ...air control lever passes through the slot provided in the fascia Centralise and level the fascia on the fire box insert door and secure the four screws Note If there is to be a timber or combustible m...

Страница 6: ...an the 2 copper pipe ends with a file or emery paper this will make brazing easier 7 Smear a liberal amount of Pioneer fire cement over the flanged face of the water heater 8 Holding the water heater...

Страница 7: ...faulty or missing bricks baffle plate baffle extension white board on the baffle plate It is critical that the fire not be operated with cracked or broken door glass Please note the above 3 points req...

Страница 8: ...ce every hour over a 6 8 hour period During the very first fire your Metro will give off an odour and fumes as the firebox paint cures Do not be alarmed Open all windows and externally opening doors i...

Страница 9: ...sually be sufficient Retighten then repeat by loosening the lower hinge nut this time applying a slight downwards pressure onto the door to move the lower hinge assembly back a similar distance then r...

Страница 10: ...r clean and refit the cowl Remove the excess soot which has fallen into the firebox leaving a layer of ash 10mm deep on the base of the firebox then refit the top baffle Note The baffle must be fitted...

Страница 11: ...aft issues but if you have an ECO Cowl fitted as standard you will also need to add another 600mm of flue pipe to compensate as the H Cowl is shorter in length Directional Cowl designed for high wind...

Страница 12: ...ot being regularly maintained and serviced warranty may be declined It is critical that the fire not be operated with over worn faulty or missing door seals Door seals will harden over time and become...

Отзывы: