metrofires ECO Mega Smart Built-In Скачать руководство пользователя страница 1

Installation Important information ..........2
Preparing the wall/opening cavity .........3
Installing your Metro ................................4
Floor protector requirements ...................5
Flue and wetback Installation.................6
Operation Important information ...........7
Where to install a Metro in your home ....8

Getting to know your Metro ....................8
Operating your Metro ..............................8
Cleaning and maintenance  .............9-10
Replacement parts  ...............................10
Troubleshooting .....................................11
Metro warranty.......................................12

ECO Mega Smart Built-In

Wood Fire Installation & Owner’s Operation Manual

PO Box 11, Inglewood 4347, New Zealand
Ph (06) 756 6520 •  Fax (06) 756 6540
[email protected] • www.metrofires.co.nz

01/16 © PIONEER MANUFACTURING LTD

Содержание ECO Mega Smart Built-In

Страница 1: ...Where to install a Metro in your home 8 Getting to know your Metro 8 Operating your Metro 8 Cleaning and maintenance 9 10 Replacement parts 10 Troubleshooting 11 Metro warranty 12 ECO Mega Smart Built...

Страница 2: ...alled correctly We recommend a competent and suitably qualified NZHHA installer WARNING Important Information Mixing of appliance or flue system components from different sources or modifying the dime...

Страница 3: ...ial Please note fire rated gib board is not an acceptable material 915mm 1000mm 1200mm 818mm 1000mm Diagram 1 Stage 2 Preparing the wall opening cavity The timber frame opening must be a minimum of 84...

Страница 4: ...ning are equal Secure the ECO Mega Smart Built In to the floor through the two restraint holes provided in each corner at the front of the cabinet Masonry anchors are required for a concrete floor and...

Страница 5: ...air control lever passes through the slot provided in the fascia Centralise and level the fascia on the fire box insert door and secure the four screws Note If there is to be a timber or combustible m...

Страница 6: ...an the 2 copper pipe ends with a file or emery paper this will make brazing easier 7 Smear a liberal amount of Pioneer fire cement over the flanged face of the water heater 8 Holding the water heater...

Страница 7: ...faulty or missing bricks baffle plate baffle extension white board on the baffle plate It is critical that the fire not be operated with cracked or broken door glass Please note the above 3 points req...

Страница 8: ...ce every hour over a 6 8 hour period During the very first fire your Metro will give off an odour and fumes as the firebox paint cures Do not be alarmed Open all windows and externally opening doors i...

Страница 9: ...sually be sufficient Retighten then repeat by loosening the lower hinge nut this time applying a slight downwards pressure onto the door to move the lower hinge assembly back a similar distance then r...

Страница 10: ...r clean and refit the cowl Remove the excess soot which has fallen into the firebox leaving a layer of ash 10mm deep on the base of the firebox then refit the top baffle Note The baffle must be fitted...

Страница 11: ...aft issues but if you have an ECO Cowl fitted as standard you will also need to add another 600mm of flue pipe to compensate as the H Cowl is shorter in length Directional Cowl designed for high wind...

Страница 12: ...ot being regularly maintained and serviced warranty may be declined It is critical that the fire not be operated with over worn faulty or missing door seals Door seals will harden over time and become...

Отзывы: