background image

INSTALLATION INSTRUCTIONS 

WARNINGS 

 
Installation, adjustments and maintenance of the 
appliances must be done by authorized installers, in 
accordance with the safety standards in force. The 
manufacturer declines any responsibility if such 
obligation is not  observed. 
 

INSTALLATION 

Positioning 
–The overall/connection dimensions and the technical 
data are stated in the pages in the appendix. 
–Install the appliances only in sufficiently aired rooms. 
–Fryers are type “A1” appliances and for this reason 
the rooms must be ventilated in accordance with the 
technical standards in force. 
–Position appliances at least 10 cm from the nearby 
walls.  Such distance can be less when the walls are 
incombustible or protected by a thermal insulator. 
–The appliances are not suitable for built-in 
installation. 
 
Assembly 
–Remove the film which protects the external panels. 
Any glue remaining on these is to be removed with a 
suitable solvent. 
 
In line union of the appliances 
–Put the appliances next to each other and level them at 
the same height. 
–Unite the appliances using the special union joint-
coverings supplied upon request. 
 
Connection to the gas piping 
–Before carrying out the connection consult thegas 
delivery body. 
–Install a fast-closing cut-off cock upstream from the 
appliance in an easily accessible place. 
–Check if the appliance is set for the type of gas with 
which it will be fed. If it is not, read paragraph 
“Adaptation to another type of gas”. 
–Check for any leaks in the connection points. 
 
Oil drainage 
–Oil drain cock against accidental opening during 
operations. To drain oil from well press the cock 
command lever downwards an at the same time pull it 
forward. 
–A drainage extension with bayonett clutch is foreseen. 
Important: The container used for well drainage must 
be  large enough and of heat resistant material. 

 

CONVERSION TO ANOTHER TYPE OF GAS 

 
To adapt appliances to work with other types of gas 
carry out all the operations stated below. Nozzles and 
adhesive labels are in the bag supplied with the 
appliance. 
 
 
 

Replacement of nozzle and burner primary air 
adjustment (Fig. 1) 
- Remove the panel under the oven door. 
- Slacken grub screw V,undo injector U and remove 
together with aerator Z. 
- Replace the injector with the one indicated in Table 
T1 and screw down together with the aerator. 
- Position aerator Z at distance A as indicated in Table 
T1. 
- Retighten grub screw V and seal with red paint. 
 
Replacement of pilot burner nozzle (Fig. 2) 
–Remove control panel of appliance. 
–Unscrew closing plug R. Unscrew nozzle UP and 
change it with the proper one indicated in Table T1. 
–Screw down closing plug R. 
 
Replacement of gas preset adhesive label 
–Apply the correct adhesive label which indicates the 
new type of gas for which the appliance is now set. 
 

START-UP 

Function check 
–Start-up the appliance according to instructionsfor use 
and check the regularity of the burner ignition, the 
absence of gas leaks and the efficiency of the burnt gas 
exhaust system. 
–If necessary consult paragraph “Analysis of several 
failures”. 
 
Nominal heat input check 
–After installation or adjustment to another type of gas 
and at each maintenance intervention check the heat 
input of the appliance. 
–The nominal heat input is stated in the “Technical 
data” Table T5. 
–The appliance operates at the nominal heat input 
when the nozzles assembled are suitable for the type of 
gas used and the inlet pressure is the one indicated in 
Table T1. 
–For the measurement of the inlet pressure read 
paragrah “Inlet pressure check”. 
 
Inlet pressure check (Fig.3) 
–For the measurement of the inlet pressure use a gauge 
having a minimum definition of 0.2 mbar. 
–Remove control panel of appliance, remove seal 
screw PP from upstream pressure tapping and connect 
the gauge pipe. 
–Carry out the measurement with appliance on. 
–If the value is not within the limits indicated in Table 
T3, interrupt the operation of  the appliance and contact 
the gas delivery body. 
Disconnect the gauge pipe and screw down seal screw 
PP. 
 
 
 
 
 
 
 

Содержание OFQG 41

Страница 1: ...GAS FRYER OFQG 41 OFQG 61 Installation and Operation Manual...

Страница 2: ......

Страница 3: ...with other types of gas carry out all the operations stated below Nozzles and adhesive labels are in the bag supplied with the appliance Replacement of nozzle and burner primary air adjustment Fig 1 R...

Страница 4: ...all of the tank Restore the oil bath whenever it falls below min level marked by the special reference notch Danger of fire When the oil in the tank is hot pour the cold oil very slowly Danger of spra...

Страница 5: ...and let water flow until it is perfectly clear Clean stainless steel surfaces daily with water and non abrasive common detergents rinse well and dry thoroughly Do not use iron scouring pads or chlorat...

Страница 6: ......

Страница 7: ...gelli pilota 41 2 X 41 A mm 0 1 0 1 vite minimo DK IE LU ES IT GR FI NO NL FR PT GB SE BE HU BG SI CY LV LT MT CZ SK TR HR G30 31 G30 G31 28 30 37 28 30 28 30 ugelli bruciatori 2 X 95 4 X 95 ugelli pi...

Страница 8: ...Maa Land Country Luokka Klass Category Kaasu Gas Pa mbar LU PL I2E G20 20 NO I2H G20 20 NL I2L G25 25 LU I3 G30 G31 28 30 37 NO NL CY MT I3B P G30 30 G31 30 PL I3B P G30 37 G31 37 BE FR II2E 3 G20 G25...

Страница 9: ...r m3 h 0 74 1 48 G25 NL 25 mbar m3 h 0 82 1 64 G25 DE 20 mbar m3 h 0 86 1 72 G20 25 mbar m3 h 0 74 1 48 G25 1 25 mbar m3 h 0 86 1 72 G30 29 mbar kg h 0 55 1 10 G30 37 mbar m3 h 0 55 1 10 Kaasun kulutu...

Страница 10: ...OFQG 61 OFQG 41 ASENNUSKUVA INSTALLATIONSBILD INSTALLATION DIAGRAM G Kaasuliit nt Gasanslutning Gas connection ISO 7 1 R1 2...

Страница 11: ......

Страница 12: ...cchio Friggitrici serie snack We declare that the following equipment Gas fryers series snack Nous d clarons que l appareil suivont Friteuse gaz gamme snack Wir erkl ren dass dieses Ger t Gas Friteuse...

Отзывы: