DOMITOR DM/DB
Installation and connections
GB - 13
12
13
14
FIG. 3
6
7
8
9
FIG. 4
FIG. 5
11
10
Two-, three-chamber oven assembling (Fig 3)
(For 430-435 models, only)
• To assemble the two-chamber oven, position the
second oven (7) the fi rst oven (6) and fi x it by the
small bracket (8) and the screws (9).
• Concerning three-chamber ovens, the third oven shall
be put onto the second one and fi xed as above.
Hood assembling (Fig 5)
•
The hood (10) shall be positioned on the last oven
and fi xed by the four existing screws (11).
Chimney assembling (Fig 5)
• Unpack the chimney (12) and place it on the back of
the oven (see fi gure) by the screws (13) and relevant
washers supplied with.
In case of two- or three-chamber ovens, start assem-
bling the chimney from the lowest oven, then insert
the other chimneys one on the other (see fi gure)
placing them on the relevant ovens.
• By the screws supplied with place the cap (14) under
the chimney of the lowest oven.
Содержание DOMITOR
Страница 1: ...Installation and Operation Manual PIZZA OVEN DOMITOR...
Страница 2: ......
Страница 4: ......
Страница 42: ......