6
Waste Outlet Connection
The waste outlet is located on the right-hand side of the machine but can be
used on either side of the machine to suit your installation. If you require the
waste outlet on the left-hand side, unbolt the peeling chamber and rotate. Pipe
work for the waste outlet is not supplied.
Electrical Connection
Single Phase:
The machine works off 220/240V 50Hz 1 phase supply, it is fitted with a wall mounted
starter which incorporates the ‘on’ switch, emergency stop, no-volt release and overload
protection features. It also comes fitted with a 3-pin 13amp fused plug.
Three Phase:
The machine works off 380/415V 50Hz 3 phase supply, supplied with power cord only.
Having connected the water inlet, waste outlet and the electrical supply, the machine is ready for
operation.
Installation of Optional Extras
Tundish
(optional extra)
The use of a tundish meets the requirements of water regulations G19.1,
G19.3 & G19.4 contained in “The Water Supply Regulations 1999” and the
“Water Byelaws 2000 (Scotland)”.
The tundish can be fitted instead of the standard water inlet nozzle supplied
with all Metcalfe peelers.
Guarded Discharge Chute
(optional extra)
Patent No. 2013815
The peeler can be fitted with a guarded discharge chute. If purchased this would
be inside the peeling chamber of the unit upon delivery.
The guard protects the operator by allowing the door to the chamber to be
opened which stops hand access through the door aperture whilst the machine is
working.
Large External Interceptor
(optional extra)
The external interceptor consists of a steel tank and woven wire basket, rust
proofed after manufacture. The outlet from the tank is screwed 2” (5cm) BSP.