156 Burton Street
●
Painesville
, Ohio
●
USA
●
1.800.989.DOCKS (3625)
440.286.7135
●
Fax: 440.286.7134
●
Step #10 -
Install the following two
Pulleys
with Chain Link on the
short U-Bolts
:
2
1005-02
PWC Med. Pulley, with Chain Link.
4
0076-
1
8
3/8-16"
Serrated Flange Nut SS
4
3700-15
3/8" USS Flat washer ZY
2
3709-02
Round U-Bolt, 3/8-16"x3-1/4"Lx1-3/4"IDx1-1/2"T ZY
onto the front face of the
Front Cantilever Post Frame.
1
1260-01
Cantilever Post Frame, 36”H, Front (1200-056).
Install the U-Bolts with the round part facing forward. Use the predrilled holes to locate the
U-Bolts. Hang the Pulleys on the U-Bolts by the attached Chain Link.
Step #11-
Install the
Galv. Cable Thimble End
on a
long U-Bolt
:
1
1225-01
1/4” x 15’L Galv. Cable w/ Thimble End (1200-056).
2
0076-
1
8
3/8-16"
Serrated Flange Nut SS
2
3700-15
3/8" USS Flat washer ZY
1
3709-08
Round U-Bolt, 3/8-16"x4"L x1-3/4"IDx2"T ZY
or - substitute the following part:
1
3709-03
Round U-Bolt, 3/8-16"x5" x1-3/4"IDx2"T ZY
Install onto the rear face of the
Right Post Assembly
1
1245-01
Lift Side / Post Assembly, Right (1200-056).
Install the U-Bolt with the round part facing rearwards. Use the predrilled holes to locate
the U-Bolt to the right front upright Frame Post Assembly
.
Step #12 -
Install the following
Pulley
without Chain Link on a
long U-Bolt
:
1
1005-01
PWC Med. Pulley, without Chain Link.
2
0076-
1
8
3/8-16"
Serrated Flange Nut SS
2
3700-15
3/8" USS Flat washer ZY
1
3709-08
Round U-Bolt, 3/8-16"x4"L x1-3/4"IDx2"T ZY
or - substitute the following part:
1
3709-03
Round U-Bolt, 3/8-16"x5" x1-3/4"IDx2"T ZY
onto the rear face of the
Left Post Assembly
1
1240-01
Lift Side / Post Assembly, Left (1200-056).
Install the U-Bolt with the round part facing rearwards. Use the predrilled holes to locate
the U-Bolt to the left front upright Frame Post Assembly
.